Awarded
Relocation of 132kV UKPN Cut Throat Lane Switching Station
East West Rail Company Limited · Central government
In brief
East West Rail Company Limited awarded construction and energy work to UK Power Networks (Operations) Limited.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
East West Rail Co. (The Authority) is delivering the East West Rail programme, a nationally significant infrastructure project providing new and upgraded rail connections between Oxford, Milton Keynes, Bedford and Cambridge. As part of the delivery of the proposed six-track railway corridor north of Bedford, the railway infrastructure interfaces with existing 132kV electricity distribution assets owned and operated by UK Power Networks Operations Ltd at the Fairfield Park / Cut Throat Lane Switching Station north of Bedford. The existing switching station lies within the footprint of the proposed railway works and must be relocated to enable construction of the railway. The contract…Read the full description
East West Rail Co. (The Authority) is delivering the East West Rail programme, a nationally significant infrastructure project providing new and upgraded rail connections between Oxford, Milton Keynes, Bedford and Cambridge.
As part of the delivery of the proposed six-track railway corridor north of Bedford, the railway infrastructure interfaces with existing 132kV electricity distribution assets owned and operated by UK Power Networks Operations Ltd at the Fairfield Park / Cut Throat Lane Switching Station north of Bedford. The existing switching station lies within the footprint of the proposed railway works and must be relocated to enable construction of the railway.
The contract comprises the design, decommissioning, relocation, installation, testing and commissioning of a replacement 132kV switching station, together with all associated electrical, civil and enabling works required to maintain network resilience and continuity of supply, and to facilitate the transfer of services from the existing installation to the replacement facility.
The requirement comprises non-contestable electricity network works that may only be undertaken by the licensed Distribution Network Operator in accordance with the statutory framework established under the Electricity Act 1989 (as amended). As the owner, operator and licensed Distribution Network Operator for the affected network assets, UK Power Networks Operations Ltd is the only organisation with the legal authority and technical responsibility to undertake the required works.
Accordingly, competition is absent for technical and exclusive rights reasons. The Authority therefore intends to award the contract directly to UK Power Networks Operations Ltd. The Authority considers that the conditions for a direct award under Schedule 5, Paragraph 5 (a) and (b) of the Procurement Act 2023 are satisfied, as the works can only be supplied by a particular supplier due to the absence of competition arising from exclusive rights.
Who won
| Winner | Value | Dates |
|---|---|---|
| UK Power Networks (Operations) Limited | £22,076,599 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 107198-2026
About the buyer
East West Rail Company LimitedLast 12 months
Procurements
17Awards
7Similar open tenders
All open construction tenders- £235kestimated
- £450mframework ceiling
- £280mestimated
- £600kframework ceiling
- £225kestimated
From notice 107198-2026 on Find a Tender, first published 11 November 2026. We last checked for changes on 11 November 2026.