AwardedAwarded 24 September 2026
RIBA 4 Design Services
ORE Catapult · Public undertaking
In brief
ORE Catapult awarded architecture and engineering work to Ryder Architecture on 24 September 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The purpose of this direct award is to appoint Ryder Architecture Limited to complete the RIBA Stage 4 technical design for the drivetrain upgrade. The commission will develop and coordinate the detailed architectural and multidisciplinary design information required to support procurement, construction and delivery of the upgrade to the existing drivetrain test facility.
Who won
| Winner | Value | Dates |
|---|---|---|
| Ryder Architecture | £659,392 | Awarded 1 September 2026 26 September 2026 to 31 January 2027 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 082549-2026
- Contract award notice · UK6, notice 087320-2026
- Contract details notice · UK7, notice 090523-2026
About the buyer
ORE CatapultLast 12 months
Procurements
60Awards
53Suppliers it has used most for architecture and engineering
- Ge Energy Power Conversion UK Limited1 contract
- Intermoor Limited1 contract
- KTA Architects Ltd1 contract
- Rubb Buildings Limited1 contract
- Ryder Architecture1 contract
Similar open tenders
All open architecture and engineering tenders- £5mframework ceiling
- £5mframework ceiling
- £30mestimated
- £145mestimated
- £40mframework ceiling
From notice 082549-2026 on Find a Tender, first published 1 September 2026, last updated 24 September 2026. We last checked for changes on 28 September 2026.