AwardedAwarded 19 August 2026

Stockport Town Centre School - Multi-disciplinary Design Team Appointment

Stockport Metropolitan Borough Council · Local authority

In brief

Stockport Metropolitan Borough Council awarded architecture and engineering work to Sheppard Robson Limited on 19 August 2026.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Stockport Metropolitan Borough Council (SMBC) seeks to appoint an architecturally led multidisciplinary design and advisory team (initially including Architect, MEP, Structural and Civil Engineer, BR Principal Designer and CDM Principal Designer) to support the delivery of a new through school within the centre of Stockport. The project has the scale and vision to allow the appointed Design Team to make a significant contribution to one of Greater Manchester's fastest growing areas. The site provides the platform to develop a new educational model for Stockport, helping to address longstanding challenges and shape a more ambitious future for learners across the borough. The development of a…Read the full description
Stockport Metropolitan Borough Council (SMBC) seeks to appoint an architecturally led multidisciplinary design and advisory team (initially including Architect, MEP, Structural and Civil Engineer, BR Principal Designer and CDM Principal Designer) to support the delivery of a new through school within the centre of Stockport. The project has the scale and vision to allow the appointed Design Team to make a significant contribution to one of Greater Manchester's fastest growing areas. The site provides the platform to develop a new educational model for Stockport, helping to address longstanding challenges and shape a more ambitious future for learners across the borough. The development of a new school in the heart of Stockport represents an exciting opportunity for both the town and the selected Design Team. By working collaboratively, we have the chance to deliver a transformative project that drives positive change and leaves a lasting legacy for the community. We are looking to deliver an innovative all through school, building on the current town centre regeneration and with an emphasis on providing a new educational vision for Stockport. We aim to do this by: • Providing a thoughtfully designed all through school to meet the needs of current and future generations of Stopfordians, a benchmark for surrounding education centres. • The design of the new development will make a positive contribution to the town centre, complimenting the unique character, historic townscape and Stockport's skyline. • The new development will foster inclusive and sustainable growth of adjacent communities, by delivering the necessary social infrastructure and education provision. The architecturally-led consultant team will need to comprise a range of relevant disciplines and expertise, including: • Architect • M&E • Structural Engineer • Project Manager • Planning Consultant

Who won

WinnerValueDates
Sheppard Robson Limited
4 bids received
£1,782,766
Awarded 19 August 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Contract award notice · UK6, notice 079258-2026

About the buyer

  1. Sandscale Integrated Depot - RIBA 3 Design Study

    Westmorland and Furness CouncilNorth WestArchitecture and engineering

    Closing soon2 days leftSuitable for SMEsSmall contract

    £174kestimated
  2. PA2 - Archaeological Management Plan & HE1 Works Specification, Wallingford Scheduled Monuments

    Wallingford Town CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestArchitecture and engineering, Leisure, culture and events

    Closing soon3 days leftSuitable for SMEsSmall contract

    £40kestimated
  3. IWM/2627/Exh/3514: 3D Exhibition Design Services Framework for Imperial War Museums

    Imperial War MuseumsNorth West, South EastArchitecture and engineering, Leisure, culture and events

    Closing soon3 days leftExpress interestSuitable for SMEsFramework

    £250kframework ceiling
  4. Countryside Land Management and Estate Maintenance Framework

    Lake District National Park AuthorityNorth WestConstruction, Grounds maintenance and landscaping

    Closing soon3 days left8 lotsSuitable for SMEsFramework

    £4mframework ceiling
  5. Prioritised Capital Improvements Programme - School Properties 2026-28

    Cumberland CouncilNorth WestArchitecture and engineering

    Closing soon6 days leftSuitable for SMEs

    £1.5mestimated

From notice 079258-2026 on Find a Tender, first published 20 August 2026. We last checked for changes on 28 September 2026.