Cancelled
Surface Treatment Term Maintenance Contract
Warrington Borough Council · Local authority
In brief
Warrington Borough Council has cancelled this procurement.
The estimated value is £1,225,000 excluding VAT.
The contract runs for 1 year, up to 5 years with extensions, starting 1 April 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The Contract is for the Application of Surface Treatments works to carriageway and footway at locations identified in the annual programme with an estimated annual budget of £150,000 to 225,000.
The Contractor's service will be the design, and works application, of surface treatments to carriageway and footway, strictly on a Task-by-Task basis.
The Contract is for 1 year, with up to four 1-year extensions by mutual agreement.
Contractor's Core Maintenance Activities
It is envisaged that the following highway maintenance services will be required on an annual basis:
• Cold Applied Ultra-Thin Surfacing Utilising surface dressing techniques less than 18mm
• Cold Applied Ultra-Thin Surfacing Utilising micro surfacing techniques 18 - 25mm
• Asphalt Preservation Systems
• Footway Slurry Surfacing
• Provision and maintenance of Traffic Management.
• Provision & installation of Road Markings and Road Studs).
Who won
| Winner | Value | Dates |
|---|
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Tender notice · UK4, notice 067159-2025
- Procurement termination notice · UK12, notice 068207-2025
About the buyer
Warrington Borough CouncilLast 12 months
Procurements
46Awards
25Suppliers it has used most for construction
- Road Maintenance Services Limited1 contract
Similar open tenders
All open construction tenders- £40mframework ceiling
- £75kestimated
- £32mframework ceiling
- £160kestimated
- £24kestimated
From notice 067159-2025 on Find a Tender, first published 21 October 2025, last updated 24 October 2025. We last checked for changes on 28 September 2026.