Vyrnwy Frankton IEOI PQQ

Green Generation Energy Networks Cymru Limited · Private utility

In brief

Green Generation Energy Networks Cymru Limited has announced plans to buy construction and energy work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

The notice does not state a value.

The contract runs for 3 years, starting 9 October 2026.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Usually high: a median of 7 bids per contract for construction contracts in this region (from 329 awards in the last 12 months).

What the notice says

This Invitation for Expressions of Interest (IEOI) is issued by Green GEN Cymru Limited to seek expressions of interest for the provision of the Packages 1 - 4 for the Vyrnwy Frankton Project. Th purpose of this document is to: a) Inform the market of: (i) The scope of services; and (ii) An outline of the procurement process and timeline; b) Invite parties to express their interest in participating in the Invitation to Tender (ITT) stage for each Package; and c) Seek preliminary responses to a Pre-Qualification Questionnaire (PQQ) to derive a shortlist of Tenderers to be invited to participate in the ITT for each Package. 1.2 Project Background The Green GEN Cymru portfolio, Vyrnwy…Read the full description
This Invitation for Expressions of Interest (IEOI) is issued by Green GEN Cymru Limited to seek expressions of interest for the provision of the Packages 1 - 4 for the Vyrnwy Frankton Project. Th purpose of this document is to: a) Inform the market of: (i) The scope of services; and (ii) An outline of the procurement process and timeline; b) Invite parties to express their interest in participating in the Invitation to Tender (ITT) stage for each Package; and c) Seek preliminary responses to a Pre-Qualification Questionnaire (PQQ) to derive a shortlist of Tenderers to be invited to participate in the ITT for each Package. 1.2 Project Background The Green GEN Cymru portfolio, Vyrnwy Frankton, is to be serviced by a 132kV high-capacity double circuit connecting into National Grid Electricity Transmission (NGET) Network. The main line comprises overhead steel lattice tower. The Green GEN Cymru contracted generation connections will be made via a network of 132kV wood pole circuits, underground cables, switching and substations. FEED contract is in place to provide the initial design detail and is being delivered by Stantec. The consultant is undertaking the Principal Designer role during the FEED contract phase; the Principal Design role will be transferred to the Detailed Designer. 1.3 Scope 1.3.1 Package 1 - Substations The Vyrnwy Frankton electrical network comprises 7 distinct sites, which include: • Switching Stations • Collector Stations • Transformer Substations Several sites will incorporate: • Reactive Power Compensation Systems • Harmonic Filtering Equipment The Contractor is expected to design, install, construct, and commission the following but not limited to: Civil Works • Site platforms and foundations • Control buildings and auxiliary structures • Internal / External Access roads • Transformer Bund • Cable troughs • Surface / Foul / Oily water drainage (as required) • Site Security • Water Supply • Fire Fighting Supply • Flood Resilience (as required) • Landscaping / screening (as required) • Construction Compound Primary Works • High-voltage switchgear • Power transformers • Instrument transformers • Busbars, disconnectors, and circuit breakers • Reactive compensation units (e.g., capacitor banks, STATCOMs) • Harmonic filtering equipment Secondary Works • Protection systems (relays, merging units) • Control systems (SCADA, RTUs, PLCs, GPS clock) • Building Management System (HVAC, lighting, security) • Communication infrastructure • Metering and monitoring systems The switching/substation sites proposed for are indicated as follows: Site Name Lower Frankton Switching Station Cors y Gareg Collector Station Llyn Lort I Energy Park Switching Station Rhiwlas Substation Banc Du Energy Park Switching Station Esgair Galed Energy Park Switching Station Waun Hesgog Energy Park Switching Station The Contractor is expected to establish temporary working areas to include construction compounds, laydown areas, parking and welfare facilities. The Contractor is expected to provide as-built records once construction is complete. Package 2 - Tower line The double circuits from the NGET points of connection into mid Wales are predominantly overhead, with steel lattice towers of the L7(c) design carrying twin ACCC (Aluminium Conductor Composite Core) "Hamburg" conductors and an OPGW earth wire. The successful contractor will be responsible for the full detailed design and construction works associated with Vyrnwy Frankton tower line needs. The total route length of the tower line for Vyrnwy Frankton is approximately 45km. The intent is that the following long-time items will be procured by GGC and novated to the contractor: • Tower steel work • ACCC phase Conductor system Design Works: Full tower loading and strength assessment for the initial alignments produced by the FEED contractors, to include the detailed design of any tower strengthening requirements where necessary. The design of all tower foundations. Full electrical clearance assessment to include conductor profiling and tower wire clearance assessments, including production of route profiles and wire clearance diagrams. Selection of insulators and fittings to Green Gen Cymru specifications, including production of component and string drawings. Production of sag/tension book for conductor erection. Construction Works: Establishment of temporary working areas and accesses to include construction compounds, laydown areas, parking, welfare facilities, offsite road improvements, haul roads, drainages (pre and post construction as required) and soil management. Procurement of all materials and components not free-issued by Green GEN Cymru (currently anticipated to be tower steelwork, ACCC phase conductor, and ACCC phase conductor fittings). Installation of foundations, erection of towers, conductors, earth wire, insulators and fittings. Design and construction of any required crossing protections e.g. scaffolds for road / rail crossings. Provision of as-built records once construction complete. Package 3 - Underground Cable The Vyrnwy Frankton electrical network comprises 132kV and 33kV underground cable circuits and may require section of undergrounding in some of the overhead line circuits. The successful contractor will be responsible for the full detailed design and construction works associated with Vyrnwy Frankton underground cable needs. There are 3.5km of 132kV cable circuit (~180MVA capacity) and 3.5km of 33kV cable circuit (~50MVA capacity) associated with the Vyrnwy Frankton portfolio. Additional undergrounding section may be required through detailed design of the overhead circuits with different capacity requirements. Design Works: Full cable system design from the initial assessments produced by the FEED contractor. The electrical design to include but not limited to: • Load and short circuit studies • Cable sizing and selection • Earthing/bonding design • The civil design to include but not limited to: • Trench and duct design • Joint bay/link box design • Termination structures Construction Works: Establishment of temporary working areas and accesses to include construction compounds, laydown areas, parking, welfare facilities, offsite road improvements, haul roads, drainages (pre and post construction as required) and soil management. Procurement of all materials and components. Installation of ducted cable system including trenchless methods where necessary. Design and construction of any crossing protections/methodologies. Provision of as-built records once construction is complete. Package 4 - Wood Pole The wood pole lines for Vyrnwy Frankton network will be to the ENATS 43-50 "Trident" design and strung with either the "Upas" AAAC alloy conductor or "Oslo" ACCC high-temperature low sag conductor. An additional underslung fibre-optic cable will also be used. The successful contractor will be responsible for the full detailed design and construction works associated with Vyrnwy Frankton wood pole requirements. There are 3 wood pole circuits associated with Vyrnwy Frankton cover a total route length of approximately 100km. Design Works: Full pole and steelwork loading and strength assessment for the initial alignments produced by the FEED contractors, to include the detailed design of any strengthening requirements where necessary. The design of all foundations. Full electrical clearance assessment to include conductor profiling and wire clearance assessments, including production of route profiles and wire clearance diagrams. Selection of insulators and fittings to Green GEN Cymru specifications, including production of component and string drawings. Production of sag/tension book for conductor erection. Construction Works: Establishment of temporary working areas and accesses to include construction compounds, laydown areas, parking, welfare facilities, offsite road improvements, haul roads, drainages (pre and post construction as required) and soil management. Procurement of all materials and components noting that in the case of Oslo ACCC the conductor and conductor fittings are anticipated to be free-issued by Green GEN Cymru. Installation of foundations, erection of poles, conductors, fibre cable, insulators and fittings. Design and construction of any required crossing protections e.g. scaffolds for road / rail crossings. Provision of as-built records once construction complete. 1.4 Key Considerations - All Packages All Equipment specified will be compliant with relevant national/international standards (e.g. IEC and BS EN) for a tower lines, wood pole lines, underground cable and substation environments.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Preliminary market engagement notice · UK2, notice 082823-2025

About the buyer

Similar open tenders

All open construction tenders
  1. Contract for the Execution for Renewal of UPVC Windows & Doors at Sketty Park Phase 3

    City & County of SwanseaWalesConstruction

    Closing soon5 hours leftSmall contract

    £170kestimated
  2. Framework for the Maintenance of Fire Doors

    Vale of Glamorgan CouncilWalesConstruction, Building maintenance and repairs

    Closing soon29 hours leftLow competitionSuitable for SMEsSmall contractFramework

    £2.5mframework ceiling
  3. Multi-site solar PV installations work for cyngor gwynedd

    Cyngor GwyneddWalesEnergy and utilities, Construction

    Closing soon2 days leftLow competitionSuitable for SMEsSmall contract

    £1.4mestimated
  4. Ysgol Gymraeg Bro Helyg Primary (Air Source Heat Pump Conversion)

    Blaenau Gwent County Borough CouncilWalesConstruction

    Closing soon2 days leftSuitable for SMEsSmall contract

    £600kestimated
  5. Planned and Preventative Maintenance of CCTV, Door Access and Control Systems and Intruder Alarms

    Aneurin Bevan University Health BoardWalesSecurity, Construction

    Closing soon2 days leftLow competitionSuitable for SMEs

    £2.5mestimated

From notice 082823-2025 on Find a Tender, first published 15 December 2025. We last checked for changes on 28 September 2026.