Upcoming
Wemyss Metal Mine Works
Mining Remediation Authority · Central government
In brief
Mining Remediation Authority has announced plans to buy construction work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The notice does not state a value.
The contract runs for 15 months, up to 27 months with extensions, starting 1 June 2027.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
What the notice says
These works will be delivered as part of the Wales Metal Mine Programme (WMMP) between NRW and the Mining Remediation Authority. This programme supports the Western Wales River Basin Management Plan (Western Wales River Basin Management Plan 2021 – 2027 which was published as a final plan in July 2022 (specifically measures CYM49 - Deliver metal (non-coal) mine water programme as identified under the Metal Mine Strategy for Wales and WW0031 - Continue to investigate mine water impact and develop remediation plans in accordance with the Metal Mines Strategy for Wales). This plan has a statutory function associated with the Water Framework Directive (The Water Environment (Water Framework…Read the full description
These works will be delivered as part of the Wales Metal Mine Programme (WMMP) between NRW and the Mining Remediation Authority.
This programme supports the Western Wales River Basin Management Plan (Western Wales River Basin Management Plan 2021 – 2027 which was published as a final plan in July 2022 (specifically measures CYM49 - Deliver metal (non-coal) mine water programme as identified under the Metal Mine Strategy for Wales and WW0031 - Continue to investigate mine water impact and develop remediation plans in accordance with the Metal Mines Strategy for Wales).
This plan has a statutory function associated with the Water Framework Directive (The Water Environment (Water Framework Directive) (England and Wales) Regulations 2017).
Works – Summer 2027
• Introduction of an Upper Storage/Attenuation Pond to reduce flows into Upper Mill Race Stream. This will include increasing the existing bund height and installing flow control infrastructure. Approx length 90 metres and approx. height 1.5 metres.
• Bypass the circular collapse feature east of Glanville’s Shaft with new open channel.
• Introduction of highway drainage system and filter drain to avoid runoff finding its way into the main spoil tip.
• A new lined water channel with flow monitors from the public highway to the Nant Cwmnewydion, construing a new ford crossing and improving the existing ford crossing. Approx. length 95 metres.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 089214-2026
About the buyer
Mining Remediation AuthorityLast 12 months
Procurements
9Awards
7Suppliers it has used most for construction
- Alliance Contracting Solutions Limited1 contract
- Alun Griffiths (Contractors) Limited1 contract
- Amalgamated Construction Ltd1 contract
- Bethell Construction Limited1 contract
- Ground Control Limited1 contract
Similar open tenders
All open construction tenders- £150kestimated
- £450kestimated
- £6mframework ceiling
- £500kframework ceiling
- £1estimated
From notice 089214-2026 on Find a Tender, first published 21 September 2026. We last checked for changes on 27 September 2026.