AwardedAwarded 22 May 2026

WRAP Framework FRA081 Call Off: Ceredigion KAT Modelling Addendum

Waste & Resources Action Programme · Public undertaking

In brief

Waste & Resources Action Programme awarded architecture and engineering and environmental work to SLR Consulting Ltd on 22 May 2026.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

In 2025 WRAP commissioned work to carry out a collections option appraisal to enable Ceredigion County Council (CCC) to review the kerbside waste and recycling collection service. The project was completed based on 2023/24 data, which was the latest available at the time. In June 2025 CCC undertook a service change which restricted the amount of residual waste residents could present for collection to three bags every three weeks. Since then residual waste has decreased, while recycling and food waste tonnages have increased. As data is now available to quantify the impact of this change, an addendum to the previous project is needed to review whether the new performance levels change…Read the full description
In 2025 WRAP commissioned work to carry out a collections option appraisal to enable Ceredigion County Council (CCC) to review the kerbside waste and recycling collection service. The project was completed based on 2023/24 data, which was the latest available at the time. In June 2025 CCC undertook a service change which restricted the amount of residual waste residents could present for collection to three bags every three weeks. Since then residual waste has decreased, while recycling and food waste tonnages have increased. As data is now available to quantify the impact of this change, an addendum to the previous project is needed to review whether the new performance levels change the outcomes of the project, or affect the preferred option. The scope of the addendum to KAT modelling project will focus on comparing continuing to provide the current service (BAU) with the preferred option from the modelling (Option 1, Blueprint collections) only, with other previously modelled options being discounted. The tasks required are as follows: Undertake new modelling using custom in house model including reviewing the data changes, collating previous and new data into a model, vehicle modelling and financial modelling of core and non-core properties to produce the required outputs. A copy of the model will be required, although it will not need to be updateable. Produce a short report summarising the findings of the updated modelling, including the impact on vehicle requirements, cost and project outcomes. Please allow for two rounds of comments and review by both WRAP and CCC. Once signed off by WRAP and CCC, produce a non-technical summary of the initial report and addendum in MS Word format. Once approved, a non-technical summary in MS PowerPoint format will also be required. The cost for an additional round of review of the previous outputs (Interim report and Final report) and any necessary amendments to address additional comments is also required.Full Report - CCC review As an optional extra, the cost of including a duplicate WTS Infrastructure Scenario for using own WTS should also be included. The cost should include the addition into the addendum report and the non-technical summaries. Project management throughout, including a short weekly project management meeting for the duration of the project, should also be included.

Who won

WinnerValueDates
SLR Consulting Ltd—
1 June 2026 to 29 June 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Contract details notice · UK7, notice 050429-2026

Last time this was bought

Newport HWRC design (Call off FRA081: Local Authority Support and Waste Composition Analysis Framework, LOT 2)

Awarded
13 March 2026
Value
£32,782

Matched on Waste & Resources Action Programme, the type of work and the title; it may be a related contract rather than the same one. Check the notice to be sure.

About the buyer

  1. ITT - Archaeological Services in Relation to Marine Protection 2027-2029 - UID 365

    Historic EnglandSouth WestArchitecture and engineering, Research and development

    Closing soon9 hours left

    £312kestimated
  2. CA18575 - RFQ 2026/42 - Conservation Engineer for St Paul's Church The Crag Cemetery Rostrevor

    Newry, Mourne and Down District Council (NMD)UK-wideArchitecture and engineering

    Closing soon11 hours leftSuitable for SMEs

    £15kestimated
  3. CT4692 Programme Support Works Framework

    East West Rail Company LimitedUK-wideConstruction, Highways and street lighting

    Closing soon11 hours leftExpress interest6 lotsSuitable for SMEsFramework

    £450mframework ceiling
  4. Extra Care Housing Development - Edinburgh House

    Portsmouth City CouncilSouth EastConstruction, Grounds maintenance and landscaping

    Closing soon11 hours leftExpress interestSuitable for SMEs

    £280mestimated
  5. Client Support Framework (CSF)

    East West Rail Company LimitedUK-wideArchitecture and engineering, Environmental services

    Closing soon11 hours leftExpress interest3 lotsSuitable for SMEsFramework

    £350mframework ceiling

From notice 050429-2026 on Find a Tender, first published 28 May 2026. We last checked for changes on 28 September 2026.