AwardedAwarded 22 October 2025

45,000,000

Network Rail Infrastructure Limited · Central government

In brief

Network Rail Infrastructure Limited has awarded architecture and engineering work on 22 October 2025.

It is split into 2 lots, so a supplier can bid for part of the work.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Network Rail has awarded national Framework Agreements for the provision of Track Bed Investigations for England & Wales, and for Scotland. The framework scope includes standard and deep track bed investigations, concrete coring and various drainage surveys, which are used for the design and specification of the trackbed for track renewals. The framework is specific to the Engineering Services Design Delivery function in Network Rail. The workbank comes from client teams in the Network Rail regions who will call-off from the framework when track bed investigations are required. Due to the work-related nature of these activities, the framework terms & conditions are based on the NR29 Framework Contract for Network Rail Amended NEC4 Engineering and Construction Short Contract. The framework will run for an initial period of five years, and Network Rail will have the option to extend for two further one-year periods, providing the flexibility for a five, six or seven year framework duration.

Lots

LotTradeValue
Track Bed Investigation Framework - England & Wales
What this lot covers

The specification for the Track Bed Investigation Framework covers the following track bed investigation and associated works, and site & factual reporting which are to be provided for track sites in England & Wales: Standard Track Bed Investigation: • Determining the condition of the existing track bed and sub-grade • Assessing the condition of the existing lineside drainage. • Dynamic Cone Penetration (DCP) to determine the soil structural properties. • Trial trenches to determine drainage paths and lateral variation of track bed materials. • Categorising of Spent Ballast for disposal • Measuring structural constraints (clearances) to support the construction phase and compliance with COM Regulations 2015 (Design Risk Register) to determine construction risks and mitigations. Deep Track Bed Investigation • Deeper window sampling and Standard Penetration Test (SPT) using heavy probing techniques for investigating Track Bed Stabilisation sites. Additional Works and Other Investigation Techniques • Stiffness Measurement surveys using Falling Weight Deflectometer (FWD), and Light Weight Deflectometer (LWD). • Drainage level surveys/topographical surveys to support the design track of drainage systems. • Concrete coring of slab track or other associated foundations • Material testing • Rail and sleeper deflection monitoring using cameras, Geophones or similar.

Architecture and engineering—
Track Bed Investigation Framework - Scotland's Railway
What this lot covers

The specification for the Track Bed Investigation Framework covers the following track bed investigation and associated works, and site & factual reporting which are provided in Scotland: Standard Track Bed Investigation: • Determining the condition of the existing track bed and sub-grade • Assessing the condition of the existing lineside drainage. • Dynamic Cone Penetration (DCP) to determine the soil structural properties. • Trial trenches to determine drainage paths and lateral variation of track bed materials. • Categorising of Spent Ballast for disposal • Measuring structural constraints (clearances) to support the construction phase and compliance with COM Regulations 2015 (Design Risk Register) to determine construction risks and mitigations. Deep Track Bed Investigation • Deeper window sampling and Standard Penetration Test (SPT) using heavy probing techniques for investigating Track Bed Stabilisation sites. Additional Works and Other Investigation Techniques • Stiffness Measurement surveys using Falling Weight Deflectometer (FWD), and Light Weight Deflectometer (LWD). • Drainage level surveys/topographical surveys to support the design track of drainage systems. • Concrete coring of slab track or other associated foundations • Material testing • Rail and sleeper deflection monitoring using cameras, Geophones or similar.

Architecture and engineering—

Who won

WinnerLotValueDates
Not statedTrack Bed Investigation Framework - England & Wales—
Not statedTrack Bed Investigation Framework - Scotland's Railway—

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Contract award notice · notice 007483-2026

About the buyer

Procurements

218

Awards

77

Suppliers it has used most for architecture and engineering

  1. Vehicle Restraint Systems

    The Association of North East Councils LimitedNorth EastConstruction, Highways and street lighting

    Closing soon2 days left3 lotsSuitable for SMEsFramework

    £50mframework ceiling
  2. Specialist Consultancy Advice and Investigation Services

    Centre for Process Innovation LimitedNorth EastArchitecture and engineering

    Closing soon2 days leftSmall contractFramework

    £173kframework ceiling
  3. Health Surveillance Services

    Thirteen Housing Group LimitedNorth EastArchitecture and engineering, Healthcare services

    Closing soon2 days left

    Value not stated
  4. PA2 - Archaeological Management Plan & HE1 Works Specification, Wallingford Scheduled Monuments

    Wallingford Town CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestArchitecture and engineering, Leisure, culture and events

    Closing soon4 days leftSuitable for SMEsSmall contract

    £40kestimated
  5. Technical Implementation Partner & Business Change Partner (DASP)

    NHS Blood and TransplantNorth East, North West, East Midlands, West Midlands, East of England, South East, South WestIT services and software, Management consultancy

    Open8 days leftLow competition2 lotsSuitable for SMEs

    £9.17mestimated

From notice 007483-2026 on Find a Tender, first published 28 January 2026. We last checked for changes on 28 September 2026.