Closed

Civil Works within NGED Substations 132kV, 66kV, 33kV and 11kV Framework

National Grid UK Limited · Private utility

In brief

National Grid UK Limited was looking for suppliers for construction work. Bidding has closed and no award has been published yet.

It is a framework worth up to £40,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.

The contract runs for 1 year, up to 2 years with extensions, starting 22 June 2026.

It is split into 10 lots, so a supplier can bid for part of the work.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Works under the Framework comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Lots

LotTradeValue
Redruth, Bodmin
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Redruth, Bodmin. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£3,333,333
Plymouth, Torbay, Mid & East Devon, North Devon
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Plymouth, Torbay, Mid & East Devon, North Devon Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£3,333,333
Somerset, Mendip Western, Mendip Bath and Bristol
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Somerset, Mendip Western, Mendip Bath and Bristol. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£3,333,333
East Wales, West Wales, Swansea Area, Cardiff Area
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of East Wales, West Wales, Swansea Area, Cardiff Area. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£6,000,000
Gloucester, Hereford & Ludlow, Worcester
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Gloucester, Hereford & Ludlow, Worcester. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£3,500,000
Birmingham, Tipton
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Birmingham, Tipton. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£3,500,000
Telford, Stoke
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Telford, Stoke. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£3,500,000
Derby, Chesterfield & Mansfield, Nottingham
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Derby, Chesterfield & Mansfield, Nottingham. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£4,500,000
Coventry & Warwickshire, Northants & Milton Keynes, Leicester & Kettering
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of Coventry & Warwickshire, Northants & Milton Keynes, Leicester & Kettering. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£4,500,000
South Lincolnshire, North Lincolnshire
22 June 2026 to 21 June 2027
What this lot covers

This Framework Lot covers the geographical NGED network zones of South Lincolnshire, North Lincolnshire. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Construction£4,500,000

Timeline

  1. Tender notice · UK4, notice 031095-2026

About the buyer

Similar open tenders

All open construction tenders
  1. Provision of Asbestos Removal and Analytical/ Surveying Services for Leicestershire County Council

    Leicestershire County CouncilEast MidlandsConstruction, Building maintenance and repairs

    Closing soon18 hours left2 lotsSuitable for SMEsFramework

    £1mframework ceiling
  2. Wilford Hill Crematorium - Replacement & Maintenance Programme

    Nottingham City CouncilEast MidlandsConstruction

    Closing soon20 hours left

    £2.61mestimated
  3. GRIP 5-8 Delivery of Coventry South, Northampton CET and Tyseley Fuel Road 12

    WM Trains LimitedEast Midlands, West MidlandsConstruction, Electrical

    Closing soon2 days leftExpress interest3 lotsSuitable for SMEs

    £36.6mestimated
  4. Wootton Parish Council - Provision and Installation of Two New Play Areas

    Wootton Parish CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestGrounds maintenance and landscaping, Construction

    Closing soon2 days left2 lotsSuitable for SMEsSmall contract

    £160kestimated
  5. Arthur Green Avenue, Kirkby in Ashfield (Fire Damaged Property)

    Ashfield District CouncilEast MidlandsConstruction, Building maintenance and repairs

    Closing soon2 days leftSuitable for SMEsSmall contract

    £60kestimated

From notice 031095-2026 on Find a Tender, first published 2 April 2026. We last checked for changes on 28 September 2026.