GRIP 5-8 Delivery of Coventry South, Northampton CET and Tyseley Fuel Road 12
WM Trains Limited · Public undertaking
In brief
WM Trains Limited is looking for suppliers for construction and electrical work (East Midlands, West Midlands).
The estimated value is £36,600,000 including VAT.
The contract runs for 7 months, starting 1 June 2027.
It is split into 3 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
This is the first stage: register your interest by midday, Friday 2 October 2026, and shortlisted suppliers are invited to bid.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Key dates
- Questions by
- midday, Monday 28 September 2026
- Express interest by
- midday, Friday 2 October 2026
This is the first stage. You register interest now, and shortlisted suppliers are invited to bid later.
How bids are scored
Price 35% · Quality 65%
Quality matters most. You can win without being the cheapest.
Competition
Usually high: a median of 7 bids per contract for construction contracts in this region (from 380 awards in the last 12 months).
What the notice says
WM Trains Limited is procuring rail depot and servicing works through one advertised works procurement structured in two contractual stages. Stage 1: PCSA Under the Pre-Construction Services Agreement (PCSA), the contractor will complete the GRIP 5 design, further develop the design, and price the individual works packages. Stage 2: ECC Once those package prices have been developed and consolidated into a single commercial position, the project will proceed to award the NEC4 Engineering and Construction Contract (ECC) on a lump-sum basis for GRIP stages 6 - 8. The procurement is intended to appoint a contractor for each Lot to provide Stage 1 PCSA services. Stage 2 may follow, subject to…Read the full description
Should I bid?
Tick what applies to you. Nothing is saved.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
- Send clarification questions before midday, Monday 28 September 2026.
- Register your interest before midday, Friday 2 October 2026. Shortlisted suppliers are then invited to bid.
Lots
| Lot | Trade | Value |
|---|---|---|
| Coventry Carriage Sidings Stabling and Servicing Facility 1 June 2027 to 31 December 2027 What this lot coversCoventry Carriage Sidings are located immediately south of Coventry Station adjacent to the Leamington Line and currently comprise four sidings with limited operational use. The sidings are currently classified as Network Rail sidings and only Roads 3 and 4 are presently accessible due to track materials being stored on Roads 1 and 2. Live OHLE infrastructure is present at the entrance to the sidings and on the adjacent main line. It is intended to develop the sidings into an operational stabling and light maintenance facility to support the Class 730 fleet and future operational requirements associated with the Coventry and Snow Hill routes. The project shall provide overnight stabling capacity for up to ten 3-car Class 730 units together with servicing infrastructure including CET, tanking, cleaning, walking routes, welfare facilities, lighting, security, electrical infrastructure and operational safety systems. The development is expected to require significant civils, track, M&E, drainage, OHLE, operational safety and depot infrastructure works. The proposed changes are also expected to require the sidings to be reclassified as a Light Maintenance Depot, subject to Network Rail approvals. The project will also improve operational access to the sidings through reinstatement of the disused walking route from Platform 4 and associated access, security and lighting upgrades. | Construction, Electrical, Architecture and engineering | £19,200,000 |
| Northampton Riverside CET 1 June 2027 to 31 December 2027 What this lot coversThe Train Presentation Team currently undertake the evacuation of Controlled Emission Toilets and tanking on the 4-car Class 350 units using mobile bowser units whilst trains are dwelling at Northampton Station on Platforms 1, 2 and 3. These mobile units are then discharged by connecting to a discharge point located near the south end of bay platform 4 or the north end of platform 2. Whilst these facilities are suitable for CET maintenance activities on the Class 350 units, they are not suitable for evacuating the CET on the new Class 730 units as the connection points are located below the sole bar and cannot be accessed from the platform. This project scope is to provide the facilities required by the Train Presentation Team to undertake both CET and train servicing activities and for drivers to safely access and egress the trains when stabled in Northampton Riverside Sidings A and B. To support these activities, WM Trains have created a Light Maintenance Depot at Northampton within which the following activities will be undertaken overnight on the Class 730 trains stabled in the river sidings: CET extraction, flushing and tanking waste removal internal cleaning topping up of screen wash pre-train operation inspections front end cleaning, where required topping up of train sand boxes, where required | Construction, Electrical, Architecture and engineering | £3,000,000 |
| Tyseley Road 12 Permanent Fuelling Apron 1 June 2027 to 31 December 2027 What this lot coversWM Trains currently operates fuelling and train servicing activities at Tyseley Train Maintenance Depot, Birmingham using existing permanent fuelling roads 13, 14 and 15. Following operational changes associated with fleet deployment, revised timetable requirements and depot operational constraints, the temporary fuelling arrangements installed on Road 12 during previous fuelling enhancement works have become operationally critical. The project will provide a permanent embedded track fuel apron and associated servicing infrastructure on Road 12 to replace the temporary arrangements. The proposed project will provide a permanent embedded track fuel apron, associated below ground drainage and interceptor systems, fuelling and servicing facilities, canopy structures, depot protection interfaces, lighting, CCTV, M&E infrastructure and associated operational facilities. The project shall support the safe and efficient servicing of up to 6-vehicle formations without splitting or shunting and shall be designed to accommodate current and future operational requirements. | Construction, Electrical, Architecture and engineering | £14,400,000 |
Timeline
- Preliminary market engagement notice · UK2, notice 069958-2026
- Preliminary market engagement notice · UK2, notice 078682-2026
- Tender notice · UK4, notice 084519-2026
About the buyer
Similar open tenders
All open construction tenders- £1mframework ceiling
- £2.61mestimated
- £160kestimated
- £60kestimated
- £100kestimated
From notice 069958-2026 on Find a Tender, first published 23 July 2026, last updated 7 September 2026. We last checked for changes on 28 September 2026.