Closed
Collett Park Gateway
Shepton Mallet Town Council · Local authority
In brief
Shepton Mallet Town Council was looking for suppliers for architecture and engineering work. Bidding has closed and no award has been published yet.
The estimated value is £800,000 excluding VAT.
The contract runs for 10 months, starting 2 March 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The Collett Park Gateway project is an opportunity to reconfigure the park's western gateway making a fresh and exciting contribution to the town. Shepton Mallet Town Council (SMTC) wish to appoint a design team to work collaboratively to bring imaginative, sustainable design to this pivotal site. Improving the arrival to this important public park will enhance users experience and attract greater footfall to the park year round, serving a growing local population. It will provide an attractive café and amenities with good indoor, outdoor connectivity between spaces. It will improve accessibly and active travel connections marking the beginning of the extended Strawberry Line the cycle…Read the full description
The Collett Park Gateway project is an opportunity to reconfigure the park's western gateway making a fresh and exciting contribution to the town. Shepton Mallet Town Council (SMTC) wish to appoint a design team to work collaboratively to
bring imaginative, sustainable design to this pivotal site.
Improving the arrival to this important public park will enhance users experience and attract greater footfall to the park year round, serving a growing local population. It will provide an attractive café and amenities with good indoor,
outdoor connectivity between spaces. It will improve accessibly and active travel connections marking the beginning of the extended Strawberry Line the cycle route and multi user path to Wells and Clevedon.
The project is led by a working party of Town Councillors and should continue to be informed by active stakeholder and public engagement.
Project Aims
• To improve the facilities at the park, providing better experience for park users and residents.
• To support economic regeneration encouraging greater footfall to the town through the year.
• To make the park gateway more attractive, accessible and sustainable.
• To support people's health and well-being, bringing people in contact with one another and nature.
• To mark the beginning of the Strawberry Line enabling active travel and recreation.
3.2 Project Outcomes
The proposed indoor and outdoor spaces should maximise the potential of the site, creating a renewed sense of place whilst contributing to character, natural beauty and heritage of the park in an inclusive, fresh and innovative way. Proposals should
include:
• A safer, more welcoming, accessible and well-connected park entrance that reflects the significance of the park in the town and is attractive to passers-by.
• Modern and accessible toilets that meet the needs of the volume and diversity of park users, that may if feasible, include a Changing Places standard room. The toilets should operate separately from the café and be able to be locked remotely to extend opening hours.
• Improved café appearance and function with the capacity to also serve outdoor/ takeaway refreshments at busy times of the year. Options to include as feasible:
> An updated, expanded kiosk with a covered outdoor area.
> An indoor space for around ten to fifteen covers.
> An area to be used as a community space e.g. for small meetings, workshops or events at quieter times.
• Tool storage and a small vehicle garage for the maintenance team. Store for four commercial refuse and three wheely bins.
• Collett Park and Strawberry Line signage.
• The re-siting of existing amenities as needed such as; the water fountain, existing park signs and defibrillator.
• The potential to develop areas of soft landscape elements with the park community over time.
• A welcoming space for cyclists at the beginning of the Strawberry Line with improved cycle connections from the Strawberry Line to Park Road and the town centre.
The building and outdoor spaces should be robust and sensitively lit and become part of the regular maintenance of the park. It is likely that the cafe will continue to be leased by an operator and not run by the Town Council.
Outline Programme
Jan Feb 2026 Design Team Appointed
Feb / April 2026 RIBA Stage 2, Develop Concept Design & Make Pre-Application Enquires
May / June 2026 Visualise possibilities and engage the public.
July / Oct 2026 RIBA Stage 3 & Planning Application
2027 RIBA Stage 4 and Tender & Start on Site.
Timeline
- Tender notice · UK4, notice 075963-2025
- Tender notice · UK4, notice 075968-2025
- Tender notice · UK4, notice 076022-2025
- Tender notice · UK4, notice 078518-2025
- Tender notice · UK4, notice 080547-2025
- Tender notice · UK4, notice 083574-2025
About the buyer
Shepton Mallet Town CouncilLast 12 months
Procurements
1Awards
0Similar open tenders
All open architecture and engineering tenders- £50mframework ceiling
- £173kframework ceiling
- Value not stated
- £40kestimated
- £9.17mestimated
From notice 075963-2025 on Find a Tender, first published 21 November 2025, last updated 16 December 2025. We last checked for changes on 28 September 2026.