AwardedAwarded 1 November 2025
Eagle Kitchen Block Refurbishment
Eagle & Swinethorpe Parish Council · Local authority
In brief
Eagle & Swinethorpe Parish Council awarded construction work to Belton Construction on 1 November 2025.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Scope of works - Demolition- • Strip out all windows and doors. • Remove existing fascia, guttering and downpipes • Remove existing roof covering • Fully strip out all internal fittings, ceilings and floor coverings • Strip out and isolate plumbing and electrical works. • Demolish internal wall • Form new door to Accessible WC DPC- • Inject all existing walls with new DPC injection Steel work- • Install new veranda steel framework. Foundations- • Excavate & concrete 4 x pad foundations as engineers' details • Excavate & concrete strip foundation for dwarf wall Brickwork- • Build new dwarf wall in engineering red bricks with brick on edge detail to the top of the wall. • We have allowed…Read the full description
Scope of works -
Demolition-
• Strip out all windows and doors.
• Remove existing fascia, guttering and downpipes
• Remove existing roof covering
• Fully strip out all internal fittings, ceilings and floor coverings
• Strip out and isolate plumbing and electrical works.
• Demolish internal wall
• Form new door to Accessible WC
DPC-
• Inject all existing walls with new DPC injection
Steel work-
• Install new veranda steel framework.
Foundations-
• Excavate & concrete 4 x pad foundations as engineers' details
• Excavate & concrete strip foundation for dwarf wall
Brickwork-
• Build new dwarf wall in engineering red bricks with brick on edge detail to the top of the wall.
• We have allowed for 1 bricklayer plus materials for general brick work repairs to the existing building.
Foul and rainwater underground drainage-
• We have allowed to install new under ground drains and manholes as shown on the architect's drawings with a connection on to the existing run. Back fill and make good.
Roof timbers-
• We have allowed for all new roof timbers to the veranda only with Stirling board over the top and 9mmm ply to the underside as the engineer's detail.
• We have allowed for new white UPVC fascia and guttering to the veranda and existing building.
Insulation-
• All roof; walls and acoustic insulation is included as per the architects' drawings.
• With the associated vapour barriers as specified
Internal walling-
• All perimeter treated timber studwork as shown
• All internal standard studs as shown
• All metal stud walls with 18mm sheathing ply to both sides as shown.
Joinery-
• MDF window boards to all windows
• 3 x vertical pipe boxings
• 1 new internal door set
• Architraves to 1 internal door
• Supply and fit new kitchen from Howdens
• Supply and fit internal dividing panels to the women's and man's WC
• Supply and fit fire blanket, extinguisher and signage
Plastering-
• Plasterboard and skim ceilings
• Plasterboard only the walls
Electrical works-
• All electrical items as specified
• Supply and fit Solar panels (PV)
• All extractor fans x4
• Panel heaters x4
• Smoke alarms
Plumbing-
• Remove and dispose of redundant services
• Supply and fit 3no close coupled WC pans, cisterns and seats
• Supply and fit 3no wall hung WHB's complete with TMV's and mixer taps
• Supply and fit 1no urinal with exposed cistern and flush pipe
• Supply and fit 1no Doc M pack with contrasting grab rails
• Supply and fit 2no water heaters
• Fit kitchen sink with allowance for 1no appliance
Wall finishes-
• Supply and fit white rock to all walls.
Decorations-
• Paint ceilings white
• Paint internal exposed woodwork
Floor coverings-
• Supply and fit floor coverings as specified with coved upstand
External paving-
• Begin to excavate the existing concrete slab and dispose of from site.
• Supply and install 150mm of type 1 sub-base material to the entire area and compact in layers using heavy plant.
• Supply and install necessary formwork.
• Break points and levels to be agreed on site.
• Supply and install corduroy hazard warning tactiles
• Supply and install C30/35 ready-mix concrete to achieve approx. 100mm thickness.
• Level, tamp and apply brushed finish
• Spread topsoil and seed to make good, disturbed areas
• Install 4 x kee klamp barriers near doors/windows
Quotation.
Cost of works £117'181.54+VAT
Who won
| Winner | Value | Dates |
|---|---|---|
| Belton Construction (SME) | £120,000 | 1 July 2026 to 1 December 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract details notice · UK7, notice 020244-2026
About the buyer
Eagle & Swinethorpe Parish CouncilLast 12 months
Procurements
1Awards
1Suppliers it has used most for construction
- Belton Construction1 contract
Similar open tenders
All open construction tenders- £75kestimated
- £400kestimated
- £50mframework ceiling
- £8mframework ceiling
- £160kestimated
From notice 020244-2026 on Find a Tender, first published 6 March 2026. We last checked for changes on 28 September 2026.