West Midlands Combined Authority awarded construction and architecture and engineering work to Network Rail Infrastructure Limited on 30 October 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The upgrade of Witton and Aston stations was identified as a Mayoral priority in April 2025, with delivery of the interventions to be completed ahead of the UEFA Euro 2028, which nearby Villa Park Stadium is set to host four international football matches.
We are now proposing to continue the development phase into Engineering Stage 5 with Network Rail and in parallel commence advanced enabling works activities ahead of a targeted completion ahead of UEFA Euro 2028.
Design Development
The project has proceeded through design stages ES3 and ES4 and now needs to progress to detailed design. This is Engineering Stage 5 (ES5) in Network Rail's PACE framework. Additional elements for the next design phase include Overhead Line Equipment (OLE) isolation works to minimise disruption to the network in advance of the enabling works and core construction work phases, preliminary / personnel costs, contingency, and property and planning costs associated with the Waterworks site.
Enabling Works Need
To achieve programme and completion in advance of UEFA Euro 2028, enabling works are required in parallel to ES5 (detailed design) development.
Who won
| Winner | Value | Dates |
|---|---|---|
| Network Rail Infrastructure Limited | £4,221,520 | Awarded 30 October 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 105195-2026
- Contract award notice · UK6, notice 105286-2026
About the buyer
West Midlands Combined AuthorityLast 12 months
Procurements
203Awards
157Suppliers it has used most for construction
- Haigh Rail Limited8 contracts
- City Demolition Contractors (Birmingham) Limited2 contracts
- Bus Shelters Ltd.1 contract
- Cawarden Co. Limited1 contract
- Char.gy Limited1 contract
Similar open tenders
All open construction tenders- £5mframework ceiling
- £5mframework ceiling
- £16mestimated
- £1mestimated
- £3.76mestimated
From notice 105195-2026 on Find a Tender, first published 5 November 2026, last updated 5 November 2026. We last checked for changes on 5 November 2026.