East Sussex County Council has announced plans to buy construction and electrical work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The estimated value is £691,666,667 excluding VAT.
The contract runs for 15 years, up to 17 years with extensions, starting 26 April 2027.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Key dates
- Bids by
- 1pm, Friday 29 January 2027
Competition
Typical: a median of 3 bids per contract for this buyer (from 13 awards in the last 12 months).
What the notice says
East Sussex County Council (ESCC) is procuring a Concession Contract for the provision of Electric Vehicle (EV) Charge Points, together with the ongoing management, operation and maintenance of the charging network. ESCC has secured £4.441 million of funding through the Local Electric Vehicle Infrastructure (LEVI) Fund, which will be provided as a subsidy to support deployment of the network. The network is intended primarily to support residents without access to off-street parking who are therefore reliant on public charging infrastructure and the majority of the charge points will be at on-street locations. The minimum level of infrastructure required by ESCC is: - 1590 Standard charge…Read the full description
East Sussex County Council (ESCC) is procuring a Concession Contract for the provision of Electric Vehicle (EV) Charge Points, together with the ongoing management, operation and maintenance of the charging network.
ESCC has secured £4.441 million of funding through the Local Electric Vehicle Infrastructure (LEVI) Fund, which will be provided as a subsidy to support deployment of the network.
The network is intended primarily to support residents without access to off-street parking who are therefore reliant on public charging infrastructure and the majority of the charge points will be at on-street locations.
The minimum level of infrastructure required by ESCC is:
- 1590 Standard charge points (up to 7.9kW)
- 20 Rapid charge points (50kW to 149kW)
The successful Tenderer must deliver infrastructure at the mandatory sites identified by ESCC. In addition, the successful Tenderer may propose further sites, additional charge points and an alternative portfolio mix, provided that the minimum infrastructure requirements are met.
As ESCC is not specifying the exact number of charge points to be operated under the Contract, it is difficult to estimate the total value of the concession, as this will depend (among other things) on the final portfolio of charge points included within the successful Tenderer's proposal.
The value of the concession over the Contract Term has therefore been estimated as being between £160 million and £830 million. This estimate is based on two modelling scenarios:
Scenario 1: Minimum charge point infrastructure, 5% utilisation growth:
• 1,590 Standard 7kW charge points and 20 Rapid 50kW charge points;
• Charge points delivered over 4 years;
• Standard utilisation starting at 10%, Rapid starting at 6%, 5% utilisation growth per year from Year 5 onwards;
• Starting tariff of £0.54/kWh for Standard and £0.82/kWh for Rapid charge points, indexed annually in line with the Consumer Price Index (CPI);
• £4.441m LEVI subsidy.
Scenario 2: Enhanced charge point infrastructure, 10% utilisation growth:
• 2000 Standard Plus 22kW charge points and 75 Rapid 149kW charge points;
• Charge points delivered over 4 years;
• Standard Plus utilisation starting at 8%, Rapid starting at 6%, 10% utilisation growth per year from Year 5 onwards;
• Starting tariff of £0.54/kWh for Standard Plus charge points, and £0.82/kWh for Rapid charge points, indexed annually in line with the Consumer Price Index (CPI);
• £4.441m LEVI subsidy.
The estimated contract value is provided for procurement purposes only and does not constitute any guarantee of future revenue. Actual revenue levels will vary over the Contract Term (15+1+1 years) and may be affected by a range of factors outside ESCC's control, including but not limited to:
- The number of charge points included within the successful bid;
- The power ratings of the charge points provided;
- EV uptake and changes in vehicle affordability;
- Utilisation of on-street charging infrastructure;
- Developments in charge point technology;
- Developments in EV and battery technology;
- Availability of charge points and downtime associated with maintenance and repairs;
- Changes in customer charging behaviours and charging arrangements;
- Future Government policy, funding and investment in the EV sector;
- Electricity market prices and wider energy costs; and
- Local Government Reorganisation and any resulting changes to Local Authority boundaries or responsibilities.
Please note, the date for publication of the tender notice is estimated. This date is subject to approval to proceed from the funding body.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
- Make sure your bid arrives before 1pm, Friday 29 January 2027. Late bids are usually rejected.
Timeline
- Planned procurement notice · UK3, notice 107954-2026
About the buyer
East Sussex County CouncilLast 12 months
Procurements
191Awards
164Suppliers it has used most for construction
- George Stone Limited5 contracts
- Clarke Roofing (Southern) Limited4 contracts
- Edgar and Wood Mechanical Services Limited4 contracts
- JG & JR Landgridge Limited4 contracts
- John Farrington & Co Ltd4 contracts
Similar open tenders
All open construction tenders- £5mestimated
- Value not stated
- £500kestimated
- £45kestimated
- £220kestimated
From notice 107954-2026 on Find a Tender, first published 13 November 2026. We last checked for changes on 13 November 2026.