AwardedAwarded 23 April 2026

Fully Managed Energy Supply Service (Gas and Electric)

Cheshire East Council · Local authority

In brief

Cheshire East Council awarded architecture and engineering and energy work to West Mercia Energy on 23 April 2026.

The notice gives a value of £60,250,000 excluding VAT.

The contract runs for 3 years, up to 5 years with extensions, starting 1 April 2027.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

The Council sought to make provision for its electricity and gas requirements from 1st April 2027 for a period of three years with the option to extend for 2 x 12 months. The Council procured a fully managed service whereby the Managed Service Provider (MSP) will purchase energy for and on behalf of the Council via an established framework or dynamic purchasing system that is compliant with either the previous or current Procurement Regulations. It will provide a flexible purchasing method of procuring energy and will provide an end-to-end billing and management service. It will take the form of a single contract with the MSP negating the need to have a separate contract with the energy…Read the full description
The Council sought to make provision for its electricity and gas requirements from 1st April 2027 for a period of three years with the option to extend for 2 x 12 months. The Council procured a fully managed service whereby the Managed Service Provider (MSP) will purchase energy for and on behalf of the Council via an established framework or dynamic purchasing system that is compliant with either the previous or current Procurement Regulations. It will provide a flexible purchasing method of procuring energy and will provide an end-to-end billing and management service. It will take the form of a single contract with the MSP negating the need to have a separate contract with the energy suppliers. Deliveries of services included are as follows: • Account Management including customer service; • Billing; • Management of Sites and Metering; • Data Management; • Purchase of green electricity; • Complaints Handling; • Online Management Portal; • Portfolio Reviews; • Performance Requirements and Service Levels The new procured service will cost £10.1 million per annum, covering an annual volume of around 26 GWh of electricity and 45 GWh of gas. The Managed Service cost will be circa £100,000 per annum whereas the Energy cost will be £10,000,000 per annum (subject to fluctuations.) The contract provides for the possibility that the contract value may be modified by an increase or decrease during the contract term, in line with one or more of the following parameters: energy tariffs; energy volume consumption changes; applicable VAT rates; adjustments to school and academy participation; and/or upon exercise of the option to take up green gas supply. As that potential for modification to contract value has been specifically provided for in the contract, and as such a modification would not change the overall nature of the contract, it shall be considered by the contracting authority to be a permitted modification under section 74 and Schedule 8(1) of the Procurement Act 2023, without the need for a new procurement. The values given in this notice are only estimations and take into account the extension option - the Council gives no guarantee or warranty or makes any representation as to the accuracy of any indicative volumes.

Who won

WinnerValueDates
West Mercia Energy
1 bid received
£50,500,000
Awarded 23 April 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Tender notice · UK4, notice 013694-2026
  2. Contract award notice · UK6, notice 051294-2026

About the buyer

Cheshire East CouncilLast 12 months

Procurements

110

Awards

84

Suppliers it has used most for architecture and engineering

  1. Sandscale Integrated Depot - RIBA 3 Design Study

    Westmorland and Furness CouncilNorth WestArchitecture and engineering

    Closing soon2 days leftSuitable for SMEsSmall contract

    £174kestimated
  2. PA2 - Archaeological Management Plan & HE1 Works Specification, Wallingford Scheduled Monuments

    Wallingford Town CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestArchitecture and engineering, Leisure, culture and events

    Closing soon3 days leftSuitable for SMEsSmall contract

    £40kestimated
  3. IWM/2627/Exh/3514: 3D Exhibition Design Services Framework for Imperial War Museums

    Imperial War MuseumsNorth West, South EastArchitecture and engineering, Leisure, culture and events

    Closing soon3 days leftExpress interestSuitable for SMEsFramework

    £250kframework ceiling
  4. Countryside Land Management and Estate Maintenance Framework

    Lake District National Park AuthorityNorth WestConstruction, Grounds maintenance and landscaping

    Closing soon3 days left8 lotsSuitable for SMEsFramework

    £4mframework ceiling
  5. Prioritised Capital Improvements Programme - School Properties 2026-28

    Cumberland CouncilNorth WestArchitecture and engineering

    Closing soon6 days leftSuitable for SMEs

    £1.5mestimated

From notice 013694-2026 on Find a Tender, first published 16 February 2026, last updated 1 June 2026. We last checked for changes on 28 September 2026.