Closed
Future Labs - Rail Industry Energy Resilience
Transpennine Trains Limited · Public undertaking
In brief
Transpennine Trains Limited was looking for suppliers for architecture and engineering and energy work. Bidding has closed and no award has been published yet.
It is a framework worth up to £50,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
The contract runs for 1 year, starting 30 June 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The rail industry is calling on the UK’s brightest minds to help shape the future of transport, inviting creators, problem-solvers and disruptors from every corner of the country to help improve sustainability, safety and accessibility across Britain’s rail network. Through Future Labs, the public ownership flagship innovation programme, Britain’s train operators are seeking pioneering solutions to four of rail’s toughest challenges. DFTO train operators have environmental and sustainability targets, whether that is for their overall carbon emissions, or specific to certain parts of their operations. In stations, we want to meet targets such as the creation of net zero stations. Severe…Read the full description
The rail industry is calling on the UK’s brightest minds to help shape the future of transport, inviting creators, problem-solvers and disruptors from every corner of the country to help improve sustainability, safety and accessibility across Britain’s rail network.
Through Future Labs, the public ownership flagship innovation programme, Britain’s train operators are seeking pioneering solutions to four of rail’s toughest challenges.
DFTO train operators have environmental and sustainability targets, whether that is for their overall carbon emissions, or specific to certain parts of their operations. In stations, we want to meet targets such as the creation of net zero stations.
Severe weather events are occurring more frequently and are already impacting our operations. There is a risk that such events may impact our ability to provide a safe and operational environments for our customers and people in the future.
We also know that energy generation comes from a variety of sources, and not all are renewable (low carbon intensive). As a consumer of electricity, DFTO operators cannot stipulate exactly where our electricity comes from, and the balance of power sources is very weather dependent. Although we may have purchased green energy financially, this does not mean that we are actually consuming green energy (this is a financial arrangement only). Energy production and transmission is based on regional generation and whole network loading, which is managed entirely by National Grid. There are current plans to install battery storage within some stations to store greener energy, either from onsite generation, or from when the local grid is providing low carbon intensity energy.
When it comes to energy resilience, Future Labs is seeking new ways to generate, store and manage clean energy directly on-site. Innovators are encouraged to explore how battery systems, solar power or novel technologies could help stations become self-sufficient, resilient and low carbon, even in the face of disruption.
Train Operating Companies (TOCs) in scope:
•LNER,
•TransPennine Express, Northern Trains,
•Southeastern,
•South Western Railway,
•c2c
•West Midlands Railway
•London Northwestern Railway and
•Greater Anglia.
Objectives of the engagement
The contracting authority wishes to engage with the market to:
•Understand market capability and capacity
•Explore potential delivery models and commercial approaches
•Inform the scope, structure and procurement strategy of any future process
Timeline
- Preliminary market engagement notice · UK2, notice 010144-2026
- Tender notice · UK4, notice 040898-2026
- Tender notice · UK4, notice 042561-2026
About the buyer
Transpennine Trains LimitedLast 12 months
Procurements
26Awards
9Similar open tenders
All open architecture and engineering tenders- £174kestimated
- £40kestimated
- £250kframework ceiling
- £4mframework ceiling
- £1.5mestimated
From notice 010144-2026 on Find a Tender, first published 4 February 2026, last updated 8 May 2026. We last checked for changes on 28 September 2026.