General Building Construction & Maintenance Framework
Cardiff Council · Local authority
In brief
Cardiff Council was looking for suppliers for construction and building maintenance work. Bidding has closed and no award has been published yet.
It is a framework worth up to £123,514,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
It is split into 36 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Cardiff Council and the Vale of Glamorgan Council intend to establish a collaborative multi‑lot General Building, Construction and Maintenance Framework to support planned works, reactive maintenance, specialist services, and statutory compliance across their estates. The Framework will comprise a range of lots covering general building, electrical, mechanical, roofing, external works, fire and security, and statutory compliance services, with emergency response sub‑lots linked to parent lots. The Framework will run for three years with an optional one‑year extension and has an estimated total value of £123,514,000.00. Call‑offs will utilise the NEC4 suite. This Competitive Flexible…Read the full description
Lots
| Lot | Trade | Value |
|---|---|---|
| Lot 1 Electrical & Mechanical Cardiff up to 300,000 GBP 1 April 2027 to 1 April 2030 What this lot coversMechanical Works shall include, but not be limited to, the provision of planned, reactive and emergency maintenance, repair, renewal and minor installation works to mechanical building services systems. This includes heating systems, boilers, pipework, pumps, valves, radiators, calorifiers, ventilation and associated plant and equipment. Works may also include system modifications, fault diagnosis, breakdown response, isolations, refilling, balancing and recommissioning. All works shall be undertaken in operational buildings with minimal disruption, in compliance with relevant legislation, guidance and manufacturer requirements. Electrical Works shall include, but not be limited to, planned and reactive maintenance, fault finding, repair, replacement and minor installation works to electrical installations within non‑domestic buildings. This includes lighting, small power, distribution boards, containment, emergency lighting, testing and certification, and associated control equipment. Emergency and out‑of‑hours response works are included where required. All electrical works shall comply fully with current wiring regulations, statutory obligations and Council standards, and shall include appropriate testing, certification and making good on completion. Lot 1 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £2,000,000 |
| Lot 1a Electrical & Mechanical Cardiff up to 300,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversMechanical Works shall include, but not be limited to, the provision of planned, reactive and emergency maintenance, repair, renewal and minor installation works to mechanical building services systems. This includes heating systems, boilers, pipework, pumps, valves, radiators, calorifiers, ventilation and associated plant and equipment. Works may also include system modifications, fault diagnosis, breakdown response, isolations, refilling, balancing and recommissioning. All works shall be undertaken in operational buildings with minimal disruption, in compliance with relevant legislation, guidance and manufacturer requirements. Electrical Works shall include, but not be limited to, planned and reactive maintenance, fault finding, repair, replacement and minor installation works to electrical installations within non‑domestic buildings. This includes lighting, small power, distribution boards, containment, emergency lighting, testing and certification, and associated control equipment. Emergency and out‑of‑hours response works are included where required. All electrical works shall comply fully with current wiring regulations, statutory obligations and Council standards, and shall include appropriate testing, certification and making good on completion. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times: - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 1a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £100,000 |
| Lot 2 General Building Works Cardiff up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversGeneral Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, minor internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users. Lot 2 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £2,750,000 |
| Lot 2a General Building Works Cardiff up to 300,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversGeneral Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, minor internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 2a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £400,000 |
| Lot 3 External Works Cardiff up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversExternal Works shall include, but not be limited to, the execution of planned, reactive and emergency works to the external fabric and surroundings of Council owned buildings. This may include paths, hardstanding, kerbs, steps, ramps, boundary walls, fencing and gates, drainage repairs, minor civils works, paving, external repairs to building envelopes, and associated making good. Works may also involve accessibility improvements, repairs following vandalism or weather damage, and health and safety related remedial works. All activities shall be coordinated to ensure safe access and egress, compliance with statutory requirements, and protection of the public and site users. Lot 3 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £2,750,000 |
| Lot 4 Fire & Security Cardiff up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversFire and Security Works shall include, but not be limited to, the inspection, maintenance, repair, renewal and minor installation of fire detection, alarm, suppression and security systems. This may include fire alarm systems, emergency lighting interfaces, access control, CCTV, intruder alarms and associated controls. Works may also involve fault diagnosis, system upgrades, compliance-driven remedial works and emergency response. All activities shall be carried out in accordance with relevant British Standards, statutory requirements and manufacturer guidance, with full documentation and certification provided on completion. Lot 4 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £600,000 |
| Lot 4a Fire & Security Cardiff up to 300,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversFire and Security Works shall include, but not be limited to, the inspection, maintenance, repair, renewal and minor installation of fire detection, alarm, suppression and security systems. This may include fire alarm systems, emergency lighting interfaces, access control, CCTV, intruder alarms and associated controls. Works may also involve fault diagnosis, system upgrades, compliance-driven remedial works and emergency response. All activities shall be carried out in accordance with relevant British Standards, statutory requirements and manufacturer guidance, with full documentation and certification provided on completion. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 4a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £200,000 |
| Lot 5 Roofing Works Cardiff up to 850,000GBP 1 April 2027 to 1 April 2030 What this lot coversRoofing Works shall include, but not be limited to, the removal of existing roofing materials where required, including the safe handling and disposal of waste materials. The scope encompasses heritage and traditional roofing works using appropriate materials and methods where buildings are listed or within conservation areas, as well as the installation, renewal and repair of pitched roofs using slate, tile or metal systems. Flat roofing works are also included, comprising felt, single‑ply and liquid‑applied systems. Associated works include the installation and upgrading of insulation, membranes and weatherproofing elements, together with the renewal of flashings, roofline details and rainwater goods. All works shall be completed with final inspection, testing and making good to ensure the roof is watertight, compliant and fit for purpose. Lot 5 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £3,250,000 |
| Lot 5a Roofing Works Cardiff up to 850,000GBP: Emergency Works Only 1 April 2027 to 1 April 2030 What this lot coversRoofing Works shall include, but not be limited to, the removal of existing roofing materials where required, including the safe handling and disposal of waste materials. The scope encompasses heritage and traditional roofing works using appropriate materials and methods where buildings are listed or within conservation areas, as well as the installation, renewal and repair of pitched roofs using slate, tile or metal systems. Flat roofing works are also included, comprising felt, single‑ply and liquid‑applied systems. Associated works include the installation and upgrading of insulation, membranes and weatherproofing elements, together with the renewal of flashings, roofline details and rainwater goods. All works shall be completed with final inspection, testing and making good to ensure the roof is watertight, compliant and fit for purpose. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 5a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £250,000 |
| Lot 6 General Building Works Cardiff 300,000 to 850,000GBP 1 April 2027 to 1 April 2030 What this lot coversGeneral Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users. Emergency and Out of Hours Lots The contractor shall provide an emergency out of hours call out service to respond to unforeseen incidents occurring outside normal working hours, including evenings, nights, weekends, and public holidays. Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 6 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £5,000,000 |
| Lot 7 Mechanical Works The Vale up to 500,000GBP 1 April 2027 to 1 April 2030 What this lot coversMechanical Works shall include, but not be limited to, the provision of planned, reactive and emergency maintenance, repair, renewal and minor installation works to mechanical building services systems. This includes heating systems, boilers, pipework, pumps, valves, radiators, calorifiers, ventilation and associated plant and equipment. Works may also include system modifications, fault diagnosis, breakdown response, isolations, refilling, balancing and recommissioning. All works shall be undertaken in operational buildings with minimal disruption, in compliance with relevant legislation, guidance and manufacturer requirements. Lot 7 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £1,000,000 |
| Lot 7a Mechanical Works The Vale up to 500,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversMechanical Works shall include, but not be limited to, the provision of planned, reactive and emergency maintenance, repair, renewal and minor installation works to mechanical building services systems. This includes heating systems, boilers, pipework, pumps, valves, radiators, calorifiers, ventilation and associated plant and equipment. Works may also include system modifications, fault diagnosis, breakdown response, isolations, refilling, balancing and recommissioning. All works shall be undertaken in operational buildings with minimal disruption, in compliance with relevant legislation, guidance and manufacturer requirements. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 7a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £50,000 |
| Lot 8 Electrical Works The Vale up to 500,000GBP 1 April 2027 to 1 April 2030 What this lot coversElectrical Works shall include, but not be limited to, planned and reactive maintenance, fault finding, repair, replacement and minor installation works to electrical installations within non‑domestic buildings. This includes lighting, small power, distribution boards, containment, emergency lighting, testing and certification, and associated control equipment. Emergency and out‑of‑hours response works are included where required. All electrical works shall comply fully with current wiring regulations, statutory obligations and Council standards, and shall include appropriate testing, certification and making good on completion. Lot 8 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £1,000,000 |
| Lot 8a Electrical Works The Vale up to 500,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversElectrical Works shall include, but not be limited to, planned and reactive maintenance, fault finding, repair, replacement and minor installation works to electrical installations within non‑domestic buildings. This includes lighting, small power, distribution boards, containment, emergency lighting, testing and certification, and associated control equipment. Emergency and out‑of‑hours response works are included where required. All electrical works shall comply fully with current wiring regulations, statutory obligations and Council standards, and shall include appropriate testing, certification and making good on completion. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 8a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £25,000 |
| Lot 9 General Building Works The Vale up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversGeneral Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, minor internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users. Lot 9 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £2,000,000 |
| Lot 9a General Building Works The Vale up to 300,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversGeneral Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, minor internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 9a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £250,000 |
| Lot 10 External Works The Vale up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversExternal Works shall include, but not be limited to, the execution of planned, reactive and emergency works to the external fabric and surroundings of Council owned buildings. This may include paths, hardstanding, kerbs, steps, ramps, boundary walls, fencing and gates, drainage repairs, minor civils works, paving, external repairs to building envelopes, and associated making good. Works may also involve accessibility improvements, repairs following vandalism or weather damage, and health and safety related remedial works. All activities shall be coordinated to ensure safe access and egress, compliance with statutory requirements, and protection of the public and site users. Lot 10 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £300,000 |
| Lot 10a External Works The Vale up to 300,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversExternal Works shall include, but not be limited to, the execution of planned, reactive and emergency works to the external fabric and surroundings of Council owned buildings. This may include paths, hardstanding, kerbs, steps, ramps, boundary walls, fencing and gates, drainage repairs, minor civils works, paving, external repairs to building envelopes, and associated making good. Works may also involve accessibility improvements, repairs following vandalism or weather damage, and health and safety related remedial works. All activities shall be coordinated to ensure safe access and egress, compliance with statutory requirements, and protection of the public and site users. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 10a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £25,000 |
| Lot 11 Fire & Security The Vale up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversFire and Security Works shall include, but not be limited to, the inspection, maintenance, repair, renewal and minor installation of fire detection, alarm, suppression and security systems. This may include fire alarm systems, emergency lighting interfaces, access control, CCTV, intruder alarms and associated controls. Works may also involve fault diagnosis, system upgrades, compliance-driven remedial works and emergency response. All activities shall be carried out in accordance with relevant British Standards, statutory requirements and manufacturer guidance, with full documentation and certification provided on completion. Lot 11 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £500,000 |
| Lot 11a Fire & Security The Vale 300,000GBP: Emergency Out of Hours 1 April 2027 to 1 April 2030 What this lot coversFire and Security Works shall include, but not be limited to, the inspection, maintenance, repair, renewal and minor installation of fire detection, alarm, suppression and security systems. This may include fire alarm systems, emergency lighting interfaces, access control, CCTV, intruder alarms and associated controls. Works may also involve fault diagnosis, system upgrades, compliance-driven remedial works and emergency response. All activities shall be carried out in accordance with relevant British Standards, statutory requirements and manufacturer guidance, with full documentation and certification provided on completion. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 11a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £50,000 |
| Lot 12 General Building Works The Vale 300,000 to 850,000GBP 1 April 2027 to 1 April 2030 What this lot coversGeneral Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users. Lot 12 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £3,000,000 |
| Lot 13 Roofing Works The Vale up to 850,000GBP 1 April 2027 to 1 April 2030 What this lot coversRoofing Works shall include, but not be limited to, the removal of existing roofing materials where required, including the safe handling and disposal of waste materials. The scope encompasses heritage and traditional roofing works using appropriate materials and methods where buildings are listed or within conservation areas, as well as the installation, renewal and repair of pitched roofs using slate, tile or metal systems. Flat roofing works are also included, comprising felt, single‑ply and liquid‑applied systems. Associated works include the installation and upgrading of insulation, membranes and weatherproofing elements, together with the renewal of flashings, roofline details and rainwater goods. All works shall be completed with final inspection, testing and making good to ensure the roof is watertight, compliant and fit for purpose. Lot 13 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £1,500,000 |
| Lot 13a Roofing Works The Vale up to 850,000GBP: Emergency Works Only 1 April 2027 to 1 April 2030 What this lot coversRoofing Works shall include, but not be limited to, the removal of existing roofing materials where required, including the safe handling and disposal of waste materials. The scope encompasses heritage and traditional roofing works using appropriate materials and methods where buildings are listed or within conservation areas, as well as the installation, renewal and repair of pitched roofs using slate, tile or metal systems. Flat roofing works are also included, comprising felt, single‑ply and liquid‑applied systems. Associated works include the installation and upgrading of insulation, membranes and weatherproofing elements, together with the renewal of flashings, roofline details and rainwater goods. All works shall be completed with final inspection, testing and making good to ensure the roof is watertight, compliant and fit for purpose. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 13a. | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £100,000 |
| Lot 14 Scaffolding Cardiff & The Vale up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversScaffolding Works shall include, but not be limited to, the design, erection, alteration and dismantling of access scaffolding to support planned, reactive and emergency maintenance and repair works across occupied buildings. This includes independent scaffolds, temporary access platforms, edge protection and protective fans as required. All scaffolding shall be installed, inspected and maintained in accordance with current regulations and guidance, ensuring safe access for operatives and protection for building users and the public. Lot 14 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £200,000 |
| Lot 15 Statutory Obligations Cardiff & The Vale Water up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 15 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £464,300 |
| Lot 16 Statutory Obligations Cardiff & The Vale Air Conditioning and Handling up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 16 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £83,600 |
| Lot 17 Statutory Obligations Cardiff & The Vale Sprinklers up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 17 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £29,100 |
| Lot 18 Statutory Obligations Cardiff & The Vale Kitchen Extraction up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 18 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £118,500 |
| Lot 19 Statutory Obligations Cardiff The Vale Fire Extinguishers up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 19 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £100,400 |
| Lot 20 Statutory Obligations Cardiff & The Vale Roller Shutter Doors up to 300,000 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 20 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £103,500 |
| Lot 21 Statutory Obligations Cardiff The Vale Lifts up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 21 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £101,400 |
| Lot 22 Statutory Obligations Cardiff The Vale Fire Dampers up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 22 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £37,100 |
| Lot 23 Statutory Obligations Cardiff & The Vale Building Management Systems up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 23 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £30,000 |
| Lot 24 Statutory Obligations Cardiff & The Vale Electrical Compliance up to 300,000GBP 1 April 2027 to 2 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 24 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £429,200 |
| Lot 25 Statutory Obligations Cardiff & The Vale Security: Fire Compliance up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 25 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £421,400 |
| Lot 26 Statutory Obligations Cardiff & The Vale Solar PV up to 300,000GBP 1 April 2027 to 1 April 2030 What this lot coversStatutory Obligations Works shall include, but not be limited to, the delivery of testing, inspection, servicing and cyclical maintenance activities required to ensure compliance with relevant legislation and recognised standards, including SFG20 where applicable. This includes the identification and reporting of defects, along with the completion of urgent and low‑value remedial works arising from inspections. Systems covered may include water hygiene, air conditioning and ventilation, sprinklers, kitchen extraction, fire extinguishers, roller shutter doors, lifts, fire dampers, building management systems, electrical compliance, fire compliance and solar PV installations. All works shall be fully recorded, with certificates, logs and reports provided in accordance with Council requirements. Lot 26 | Cleaning, Construction, Building maintenance and repairs, Electrical, Heating, plumbing and ventilation, Lifts and escalators, Architecture and engineering | £160,000 |
Timeline
- Preliminary market engagement notice · UK2, notice 083120-2025
- Tender notice · UK4, notice 041315-2026
About the buyer
Procurements
84Awards
20Suppliers it has used most for construction
- Cardo (Wales & West) Limited2 contracts
- M.DeLacey & Sons (HOLDINGS) Limited2 contracts
- Centregreat Limited1 contract
- Davies Contractors LTD1 contract
- Encon Construction Limited1 contract
Similar open tenders
All open construction tenders- £170kestimated
- £2.5mframework ceiling
- £1.4mestimated
- £600kestimated
- £2.5mestimated
From notice 083120-2025 on Find a Tender, first published 16 December 2025, last updated 6 May 2026. We last checked for changes on 28 September 2026.