AwardedAwarded 26 March 2026

Heat network techno-economic feasibility study for Culham

South Oxfordshire District Council · Local authority

In brief

South Oxfordshire District Council awarded architecture and engineering and energy work to AECOM Limited on 26 March 2026.

The notice gives a value of £88,000 excluding VAT.

The contract runs for 4 months, starting 2 March 2026.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Culham has been designated as the first AI Growth Zone by the UK Government. As part of this, a 100MW data centre is being developed on Culham Campus, with aspirations for up to 500MW of data centres in the longer term. There may also be a further data centre proposed for the adjacent No. 1 site which is allocated for employment use. There is an opportunity to recycle waste heat from large computer systems storing internal data to supply heating for the local community, supplying heat to multiple buildings from a central source. The National Zoning Model does not yet identify this area as a potential heat network zone as the waste heat sources do not yet exist. The timescales for completion…Read the full description
Culham has been designated as the first AI Growth Zone by the UK Government. As part of this, a 100MW data centre is being developed on Culham Campus, with aspirations for up to 500MW of data centres in the longer term. There may also be a further data centre proposed for the adjacent No. 1 site which is allocated for employment use. There is an opportunity to recycle waste heat from large computer systems storing internal data to supply heating for the local community, supplying heat to multiple buildings from a central source. The National Zoning Model does not yet identify this area as a potential heat network zone as the waste heat sources do not yet exist. The timescales for completion of the data centre are uncertain and subject to planning permission, however it is likely to be within the next five years, with an ambitious completion date suggested to be April 2028. Therefore, the council urgently needs to better understand how to capture the opportunities for low carbon heat networks arising from these developments. The South Oxfordshire Local Plan 2035 (adopted December 2020) has allocated: • land adjacent to Culham Campus for construction of 3,500 new homes - this development is a potential end user of the heat network. • A net increase of at least 7.3 hectares of employment land at/adjacent to Culham Campus - this may be a heat supplier or end user depending on the types of commercial development which come forward. A Local Development Order is being developed for the site. A previous heat mapping and energy masterplanning study for Culham was developed in 2017. This proposed three different potential heat network technologies for the site: • gas engine CHP with supplementary backup gas boilers; • centralised biomass boilers with supplementary backup gas boilers; • water source heat pump in River Thames with supplementary backup gas boilers. While the modelling and information in this study remains useful as background information, there have since been significant technological advances and changes to planned development for the site which means that this work would need to be revisited and updated as part of the techno-economic feasibility study. At this stage, the council has not committed to taking forward beyond the techno-economic feasibility study stage. Restrictions associated with local government reorganisation (LGR) will limit this council's ability to progress this project beyond the feasibility stage. However, the feasibility study will put the project in the best possible position for a third party or the successor authority, once established, to decide to progress the scheme. Furthermore, the planning applications for data centres and other nearby development are highly likely to be submitted before LGR is complete in 2028. Therefore, information is needed now so that South Oxfordshire District Council can consider whether planning powers could be utilised to require developments to be designed and constructed to supply or connect to a future heat network, including through the forthcoming Culham Local Development Order. The Council is seeking a single supplier to provide these consultancy services.

Who won

WinnerValueDates
AECOM Limited£60,453
26 March 2026 to 31 December 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Tender notice · UK4, notice 074444-2025
  2. Contract details notice · UK7, notice 028497-2026

About the buyer

Procurements

21

Awards

13

Suppliers it has used most for architecture and engineering

  1. EOD Services Sennelager Training Area

    FCDO ServicesSouth EastFire safety, Architecture and engineering

    Closing soon1 hour leftExpress interestSuitable for SMEs

    £375kestimated
  2. ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role

    The Pirbright InstituteSouth EastConstruction, Management consultancy

    Closing soon25 hours leftSmall contract

    £154kestimated
  3. Design Consultancy Framework

    Oxford Health NHS Foundation TrustSouth EastManagement consultancy, IT services and software

    Closing soon25 hours leftExpress interest11 lotsSuitable for SMEsFramework

    £4.5mframework ceiling
  4. Site Energy Project Development Services

    The Pirbright InstituteSouth EastArchitecture and engineering, Energy and utilities

    Closing soon2 days leftSmall contract

    £51kestimated
  5. Provision of EA, QS and CDM Consultant Services for Chatsworth Avenue and Hadrians Community Centre

    Waverley Borough CouncilSouth EastArchitecture and engineering

    Closing soon2 days leftSmall contract

    Value not stated

From notice 074444-2025 on Find a Tender, first published 17 November 2025, last updated 27 March 2026. We last checked for changes on 28 September 2026.