Closed
IMO Boiler Burner Replacements
Department for Transport · Central government
In brief
Department for Transport was looking for suppliers for construction and building maintenance work. Bidding has closed and no award has been published yet.
The estimated value is £100,000 excluding VAT.
The contract runs for 8 days, starting 5 October 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The works comprise the replacement and upgrade of the existing gas burner systems serving three boilers within the IMO Building. The Contractor shall undertake the works sequentially, maintaining heating resilience by ensuring a minimum of two boilers remain operational at all times. The items of works are summarised as follows: • Removal and disposal of existing Ecoflam burners and associated redundant equipment. • Supply and installation of new low-NOx gas burners, burner plates and associated components to all three boilers. • Replacement of boiler door refractory and installation of new boiler water temperature sensors. • Modifications to existing gas pipework, gas trains, electrical…Read the full description
The works comprise the replacement and upgrade of the existing gas burner systems serving three boilers within the IMO Building. The Contractor shall undertake the works sequentially, maintaining heating resilience by ensuring a minimum of two boilers remain operational at all times.
The items of works are summarised as follows:
• Removal and disposal of existing Ecoflam burners and associated redundant equipment.
• Supply and installation of new low-NOx gas burners, burner plates and associated components to all three boilers.
• Replacement of boiler door refractory and installation of new boiler water temperature sensors.
• Modifications to existing gas pipework, gas trains, electrical supplies and control wiring to accommodate the new burner installations.
• Integration of existing boiler flow switches into the burner enable circuits.
• Gas tightness testing, combustion analysis, safety device testing and manufacturer-approved commissioning of all installations.
• Provision of all required testing, commissioning and compliance documentation.
• Removal of redundant materials and completion of all associated builders' works.
The provisional timetable is:
w/c 20 Jul - issue of tender documents
23 Jul - site visits
31 Jul - deadline for tender clarifications
7 Aug @ 12noon - deadline for tender responses
11 Sep - contract award decision
If you are interested in this opportunity:
1. Register for a Jaggaer account: https://dft.app.jaggaer.com/web/login.html
2. Once you have a Jaggaer account, click through to:
itt_3263 - IMO Boiler Burner Replacements 2026
3. Book a site visit at the IMO, 4 Albert Embankment, SE1 7SR by emailing [email removed] cc [email removed] and [email removed] - please indicate dates and two hour slots in which you will be available to attend.
4. With the exception of arranging site visits, please use the messaging function on the Jaggaer Portal for all other queries. Please note that the Portal sends automated notifications to alert suppliers of new messages. These will come from noreply@jaggaer.com and may appear in your Junk folder.
Timeline
- Planned procurement notice · UK3, notice 063808-2026
- Tender notice · UK4, notice 068400-2026
About the buyer
Department for TransportLast 12 months
Procurements
153Awards
107Suppliers it has used most for construction
- Niblock (Builders) Ltd3 contracts
- LBS Security Services Limited1 contract
- Mott MacDonald1 contract
- Premier Workspace Ltd1 contract
- Resolve Salvage & Fire (Europe) Ltd1 contract
Similar open tenders
All open construction tenders- £3mframework ceiling
- £330kestimated
- £30mestimated
- £64.7mframework ceiling
- £125kestimated
From notice 063808-2026 on Find a Tender, first published 7 July 2026, last updated 20 July 2026. We last checked for changes on 28 September 2026.