Upcoming
Large Scale Non-Battery based Electrical Energy Storage Systems
UK Industrial Fusion Solutions Ltd · Public undertaking
In brief
UK Industrial Fusion Solutions Ltd has announced plans to buy architecture and engineering work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The notice does not state a value.
The contract runs for 4 years, starting 1 April 2029.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Typical: a median of 4 bids per contract for this buyer (from 20 awards in the last 12 months).
What the notice says
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed by 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants.…Read the full description
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification.
STEP is currently in its Concept Design phase, which is expected to be completed by 2026.
The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges:
Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants.
These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity.
The highly dynamic nature of these loads could make compliance with grid code requirements challenging.
For more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society
UKIFS is seeking experts to support the technology selection of a Central Energy Storage System (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and the operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters.
Rather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant. The CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection.
The scope of the CESS cannot be fully defined due to knowledge gaps in CESS behaviour and limitations. Once these are understood, a technology will be selected, and limitations will be incorporated into the electrical infrastructure design. This PME is looking to address the knowledge gaps.
The proposed technical and operations of the CESS are
•2 operational cycles per day
•Pulse length will be over 1 hour (continuous)
•Power range larger than 300MW
•Energy capacity 100-300MWh
•Response in the millisecond range
•Similar charge and discharge rates.
•Fast response time during power swings (full charge to discharge)
•High round trip efficiency: 80%
In conjunction the CESS will be required to be operated and maintained for the 20-year life of the STEP machine.
Due to the requirements, we are attempting to ascertain if this could be accomplished or partly accomplished by a non-battery-based system (Flywheel, Super-conducting magnetic storage (SMES), Capacitor, Super Capacitor, Fuel Cells or other)
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./W8UFJUNW28
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/W8UFJUNW28
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 007128-2026
About the buyer
UK Industrial Fusion Solutions LtdLast 12 months
Procurements
107Awards
44Suppliers it has used most for architecture and engineering
- Altrad Babcock Limited3 contracts
- Kyoto Fusioneering Limited3 contracts
- Amentum Clean Energy Limited2 contracts
- NPL Management Limited2 contracts
- Oxford Sigma Limited2 contracts
Similar open tenders
All open architecture and engineering tenders- £10.7mestimated
- Value not stated
- £149kestimated
- £4.5mframework ceiling
- £375kestimated
From notice 007128-2026 on Find a Tender, first published 27 January 2026. We last checked for changes on 28 September 2026.