Open8 days left · closes 5pm, Friday 9 October 2026

Manchester International Airport - OLE Phase 3 Works

Kier Transportation - CP7 NWC · Public body

In brief

Kier Transportation - CP7 NWC is looking for suppliers for construction work (North West).

The estimated value is £2,500,000 excluding VAT.

The contract runs for 1 year, starting 27 March 2027.

The buyer says it is suitable for small and medium-sized businesses.

Bids close at 5pm, Friday 9 October 2026.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Key dates

Bids by
5pm, Friday 9 October 2026

Competition

Usually high: a median of 7 bids per contract for construction contracts in this region (from 414 awards in the last 12 months).

What the notice says

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement…Read the full description
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Specialist Works for Manchester Airport Station Remodelling

Should I bid?

Tick what applies to you. Nothing is saved.

How to bid

  1. Read the full notice on Contracts Finder, including any tender documents it links to.
  2. Follow the submission instructions in the notice; it does not name an e-tendering portal.
  3. Make sure your bid arrives before 5pm, Friday 9 October 2026. Late bids are usually rejected.

Timeline

  1. Contract notice · notice 470b4da0-d0d5-4aab-a53b-f5ceb7575193-916048

About the buyer

Similar open tenders

All open construction tenders
  1. Property Maintenance & Construction Materials

    Great Places Housing GroupNorth West, Yorkshire and the HumberConstruction, Building maintenance and repairs

    Closing soon41 hours left11 lotsSuitable for SMEsFramework

    £32mframework ceiling
  2. Wootton Parish Council - Provision and Installation of Two New Play Areas

    Wootton Parish CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestGrounds maintenance and landscaping, Construction

    Closing soon41 hours left2 lotsSuitable for SMEsSmall contract

    £160kestimated
  3. Ehrc 2627-18

    Equality and Human Rights CommissionNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, Wales, ScotlandConstruction, Electrical

    Closing soon42 hours leftSuitable for SMEsSmall contract

    £24kestimated
  4. Network Services 4

    Crown Commercial ServiceNorth WestSecurity, Construction

    Closing soon44 hours left11 lotsSuitable for SMEsFramework

    £8bnframework ceiling
  5. Countryside Land Management and Estate Maintenance Framework

    Lake District National Park AuthorityNorth WestConstruction, Grounds maintenance and landscaping

    Closing soon46 hours left8 lotsSuitable for SMEsFramework

    £4mframework ceiling

From notice 470b4da0-d0d5-4aab-a53b-f5ceb7575193-916048 on Contracts Finder, first published 30 September 2026. We last checked for changes on 30 September 2026.