P1228 - Highways and Infrastructure Works Framework Agreement
Birmingham City Council · Local authority
In brief
Birmingham City Council was looking for suppliers for construction and highways work. Bidding has closed and no award has been published yet.
It is a framework worth up to £980,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
The contract runs for 8 years, starting 1 May 2026.
It is split into 5 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Birmingham City Council is seeking to appoint organisations for the provision of Highways and Infrastructure Works via the Highways and Infrastructure Works Framework Agreement. These works will range from minor highway improvements, for examples new white lining, through various pedestrian and cycling improvements, to large scale infrastructure projects. The framework agreement will cover all works required to deliver highway and infrastructure projects for the Council. • Lot 1: works with an estimated value of up to £200,000. • Lot 2: works with an estimated value of between £200,001 and £1,000,000. • Lot 3: works with an estimated value of between £1,000,001 and £10,000,000. • Lot 4:…Read the full description
Lots
| Lot | Trade | Value |
|---|---|---|
| Works with an estimated value of up to £200,000. 1 May 2026 to 30 April 2034 What this lot coversLot 1 covers the below will be awarded up a maximum of 10 suppliers. Buildability Advice – provision of construction advice during the development of the project for a supplier to act as a critical friend to the Council to challenge the feasibility and practicality of the proposals. The objective is to improve the quality of the tender specifications that are issued. To ensure there is no conflict of interest, the buildability advisor will not have expressed an interest in the construction of the project. Construct Only – delivery of works which have been designed by others. Design and Construct – where the contractor has responsibility for the design of some or all of a project as well as delivery of the works. Early Contractor Involvement – jointly, with the Council, designing and planning infrastructure projects in a cost effective and less adversarial structure. Utility Diversion and Protection Works – delivery of contestable and non-contestable works in connection with capital improvements. | Construction, Electrical, Highways and street lighting | — |
| Works with an estimated value of between £200,001 and £1,000,000 1 May 2026 to 30 April 2034 What this lot coversLot 2 covers the below will be awarded up a maximum of 6 suppliers. Buildability Advice – provision of construction advice during the development of the project for a supplier to act as a critical friend to the Council to challenge the feasibility and practicality of the proposals. The objective is to improve the quality of the tender specifications that are issued. To ensure there is no conflict of interest, the buildability advisor will not have expressed an interest in the construction of the project. Construct Only – delivery of works which have been designed by others. Design and Construct – where the contractor has responsibility for the design of some or all of a project as well as delivery of the works. Early Contractor Involvement – jointly, with the Council, designing and planning infrastructure projects in a cost effective and less adversarial structure. Utility Diversion and Protection Works – delivery of contestable and non-contestable works in connection with capital improvements. | Construction, Electrical, Highways and street lighting | — |
| Works with an estimated value of between £1,000,001 and £10,000,000 1 May 2026 to 30 April 2034 What this lot coversLot 3 covers the below will be awarded up a maximum of 3 suppliers. Buildability Advice – provision of construction advice during the development of the project for a supplier to act as a critical friend to the Council to challenge the feasibility and practicality of the proposals. The objective is to improve the quality of the tender specifications that are issued. To ensure there is no conflict of interest, the buildability advisor will not have expressed an interest in the construction of the project. Construct Only – delivery of works which have been designed by others. Design and Construct – where the contractor has responsibility for the design of some or all of a project as well as delivery of the works. Early Contractor Involvement – jointly, with the Council, designing and planning infrastructure projects in a cost effective and less adversarial structure. Utility Diversion and Protection Works – delivery of contestable and non-contestable works in connection with capital improvements. | Construction, Electrical, Highways and street lighting | — |
| Works with an estimated value greater than £10,000,000 1 May 2026 to 30 April 2034 What this lot coversLot 4 covers the below will be awarded up a maximum of 2 suppliers. Buildability Advice – provision of construction advice during the development of the project for a supplier to act as a critical friend to the Council to challenge the feasibility and practicality of the proposals. The objective is to improve the quality of the tender specifications that are issued. To ensure there is no conflict of interest, the buildability advisor will not have expressed an interest in the construction of the project. Construct Only – delivery of works which have been designed by others. Design and Construct – where the contractor has responsibility for the design of some or all of a project as well as delivery of the works. Early Contractor Involvement – jointly, with the Council, designing and planning infrastructure projects in a cost effective and less adversarial structure. Utility Diversion and Protection Works – delivery of contestable and non-contestable works in connection with capital improvements. | Construction, Electrical, Highways and street lighting | — |
| Contestable and non-contestable utility work related to capital infrastructure projects with no upper limit 1 May 2026 to 30 April 2034 What this lot coversLot 5 is solely for contestable and non-contestable utility work related to capital infrastructure projects with no upper limit. With a maximum of up to 3 suppliers awarded to this lot. | Construction, Electrical, Highways and street lighting | — |
Timeline
- Tender notice · UK4, notice 074563-2025
- Tender notice · UK4, notice 074626-2025
- Tender notice · UK4, notice 077007-2025
- Tender notice · UK4, notice 081660-2025
About the buyer
Procurements
129Awards
56Suppliers it has used most for construction
- Atkinsréalis UK Limited1 contract
- EQUANS Regeneration Limited1 contract
- Haystoun Construction Ltd1 contract
- Jacobs U.K. Limited1 contract
- Kier Transportation Limited1 contract
Similar open tenders
All open construction tenders- £2.2mestimated
- £36.6mestimated
- £110kestimated
- £160kestimated
- £1.27mestimated
From notice 074563-2025 on Find a Tender, first published 17 November 2025, last updated 10 December 2025. We last checked for changes on 28 September 2026.