Cancelled

Site Steam Upgrade Project - Principal Contractor & Installation Package

The Pirbright Institute · Local or regional public body

In brief

The Pirbright Institute has cancelled this procurement.

The estimated value is £320,000 excluding VAT.

The contract runs for 6 months, starting 22 December 2025.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright. This will be achieved by a combination of the following three factors: • New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House. • Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr). • Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation…Read the full description
The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright. This will be achieved by a combination of the following three factors: • New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House. • Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr). • Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation at low production rates during summer months. Contract Scope The contract is for a single supplier to act as the Principal Contractor and complete all works as follows: • Supporting the Stage 4 design with client nominated designer and Project Manager • Supply and Installation of EC1 steam boiler burners (x2). • Steam connection & packaged steam – LTHW interface to Engineering workshop • Enabling works for new steam & condensate return connections located on EC1 steam distribution and WBH. • Supply and installation of steam and condensate equipment. • Facilitate installation & commissioning of EC1 boiler burner replacements. • Supply and installation of new steam connection & condensate return including all required equipment. • Deliver a phased changeover of steam delivery from the WBH to the newly installed connection fed from EC1. • Decommission, removal and disposal of WBH and associated redundant equipment. • Disconnection and isolation of gas, compressed air and mains water. • Commissioning and handover including Project Information Folder (PIF) is provided to the client Project Manager.

Who won

WinnerValueDates

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Tender notice · UK4, notice 066245-2025
  2. Procurement termination notice · UK12, notice 001102-2026

About the buyer

Procurements

42

Awards

28

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. Public Art Commission, Broadway Didcot

    South Oxfordshire District CouncilSouth EastConstruction, Building maintenance and repairs

    Closing soon5 hours leftSuitable for SMEsSmall contract

    £60kestimated
  2. Phase 1 Junior Play Area Equipment Installation - Hawley Green

    Blackwater and Hawley Town CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestGrounds maintenance and landscaping, Construction

    Closing soon5 hours leftSuitable for SMEsSmall contract

    £75kestimated
  3. ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role

    The Pirbright InstituteSouth EastConstruction, Management consultancy

    Closing soon2 days leftSmall contract

    £154kestimated
  4. RBBC-AL-Horley Community Centre Modernisation (Main Contractor JCT Design & Build 2024 Edition)

    Reigate and Banstead Borough CouncilSouth EastConstruction, Building maintenance and repairs

    Closing soon2 days leftSuitable for SMEsSmall contract

    £1.6mestimated
  5. Old Farm Place Playground Design and Install

    Guildford Borough CouncilSouth EastGrounds maintenance and landscaping, Construction

    Closing soon3 days leftSmall contract

    Value not stated

From notice 066245-2025 on Find a Tender, first published 17 October 2025, last updated 7 January 2026. We last checked for changes on 28 September 2026.