AwardedAwarded 12 January 2026
Strategic Planning - Strategic Flood Risk Assessment 2025
Southend-on-Sea City Council · Local authority
In brief
Southend-on-Sea City Council awarded architecture and engineering work to Jeremy Benn Associates Limited on 12 January 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The Council is looking to procure the services of a suitably qualified consultancy to deliver a Strategic Flood Risk Assessment (SFRA), following a Level 1 review which occurred in 2018. The SFRA should provide a comprehensive and robust assessment of the extent and nature of flood risk within Southend and its implications for land use planning, accounting for the likely impact of climate change on flood risk over a future development's lifetime, as detailed below. It should be a web-based, living document that can be easily accessed and updated to reflect the latest information. The study has the following objectives: • Review and update the 2018 Level 1 SFRA as appropriate to identify…Read the full description
The Council is looking to procure the services of a suitably qualified consultancy to deliver a Strategic Flood Risk Assessment (SFRA), following a Level 1 review which occurred in 2018.
The SFRA should provide a comprehensive and robust assessment of the extent and nature of flood risk within Southend and its implications for land use planning, accounting for the likely impact of climate change on flood risk over a future development's lifetime, as detailed below. It should be a web-based, living document that can be easily accessed and updated to reflect the latest information.
The study has the following objectives:
• Review and update the 2018 Level 1 SFRA as appropriate to identify site specific flood risk assessment and recommendations for site allocations and policies;
• Undertake a Level 2 SFRA site-specific flood risk analysis for sites provided by the Council (Appendix 1) using the latest available flood risk data to determine the characteristics of any flooding that could affect the site e.g. speed of onset, depth, velocity, hazard, duration, source of flooding and mechanisms of flooding (overtopping, breaching or overland run-off for example;
• Using the latest available data, provide for each site a summary of flood risk from all sources, the key risks and potential mitigation;
• the latest climate change advice should also be applied to any updates4
• Inform the local planning authority to apply the Sequential Test by identifying the severity and variation in flood risk within medium and high-risk areas;
• Where the Exception Test is required, provide recommendations for making the site safe throughout its lifetime without increasing flood risk elsewhere;
• Take into account the most recent legislation and policy and guidance on flood risk available during the study period.
Who won
| Winner | Value | Dates |
|---|---|---|
| Jeremy Benn Associates Limited 1 bid received | £29,500 | Awarded 12 January 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract award notice · UK6, notice 011568-2026
Last time this was bought
Strategic Planning - Integrated Needs Assessment 2025
- Awarded
- 8 October 2025
- Value
- Not stated, or split across lots
- Contract ends
- 31 January 2026
Matched on Southend-on-Sea City Council, the type of work and the title; it may be a related contract rather than the same one. Check the notice to be sure.
About the buyer
Southend-on-Sea City CouncilLast 12 months
Procurements
131Awards
105Suppliers it has used most for architecture and engineering
- Civic Engineers Limited2 contracts
- Pell Frischmann Consultants Limited2 contracts
- 31ten Consulting Limited1 contract
- Gaist Solutions Limited1 contract
- Jeremy Benn Associates Limited1 contract
Similar open tenders
All open architecture and engineering tenders- £40kestimated
- £1.7mestimated
- Value not stated
- £9.17mestimated
- £150kestimated
From notice 011568-2026 on Find a Tender, first published 9 February 2026. We last checked for changes on 28 September 2026.