AwardedAwarded 28 April 2026
Temporary Offshore Wind Mooring Systems
ORE Catapult · Central government
In brief
ORE Catapult awarded architecture and engineering work to Intermoor Limited on 28 April 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
This project will be undertaken looking at potential anchorages within the Cromarty Firth and Scapa Flow;
with an aim to present selected case studies based on key technical information captured in the project
such as prevailing substructure types, expected throughput, load out strategy, preferred temporary mooring
options and what components will be wet stored.)
Who won
| Winner | Value | Dates |
|---|---|---|
| Intermoor Limited (SME) | £47,976 | Awarded 28 April 2026 29 April 2026 to 1 August 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 038267-2026
- Contract award notice · UK6, notice 038272-2026
- Contract details notice · UK7, notice 038277-2026
Last time this was bought
Temporary Offshore WindMooring Systems
- Won by
- Seaway 7 UK Limited
- Awarded
- 22 April 2026
- Value
- £62,334
- Contract ends
- 1 August 2026
Matched on ORE Catapult, the type of work and the title; it may be a related contract rather than the same one. Check the notice to be sure.
About the buyer
ORE CatapultLast 12 months
Procurements
68Awards
57Suppliers it has used most for architecture and engineering
- Ryder Architecture2 contracts
- Creo International1 contract
- Galliford Try Construction Limited1 contract
- Intermoor Limited1 contract
- Rubb Buildings Limited1 contract
Similar open tenders
All open architecture and engineering tenders- £10.7mestimated
- Value not stated
- £149kestimated
- £4.5mframework ceiling
- £375kestimated
From notice 038267-2026 on Find a Tender, first published 28 April 2026, last updated 28 April 2026. We last checked for changes on 28 September 2026.