Upcoming

The Design and installation of a low carbon heating system

Cotswold District Council · Local authority

In brief

Cotswold District Council has announced plans to buy construction and building maintenance work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

The estimated value is £500,000 excluding VAT.

The contract runs for 6 months, starting 12 January 2027.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Usually high: a median of 7 bids per contract for construction contracts in this region (from 371 awards in the last 12 months).

What the notice says

• The Council’s main offices extend to approximately 50,000 square feet and are occupied primarily as office accommodation between 08:00 and 18:00, Monday to Friday, with some out of hours use. • The building is of traditional construction with stone walls, steel frame elements and extensive glazing. The roof structure comprises timber purlins with slate coverings, alongside glazed atria and areas of flat roof. • Heating is currently provided by a series of gas fired boilers (installed within the last five years) serving a wet central heating system comprising a primary distribution loop feeding smaller bore pipework and conventional radiators throughout the building. • There is a central…Read the full description
• The Council’s main offices extend to approximately 50,000 square feet and are occupied primarily as office accommodation between 08:00 and 18:00, Monday to Friday, with some out of hours use. • The building is of traditional construction with stone walls, steel frame elements and extensive glazing. The roof structure comprises timber purlins with slate coverings, alongside glazed atria and areas of flat roof. • Heating is currently provided by a series of gas fired boilers (installed within the last five years) serving a wet central heating system comprising a primary distribution loop feeding smaller bore pipework and conventional radiators throughout the building. • There is a central air handling unit serving two large atria. • Local air conditioning units serve some meeting rooms, the council chamber, and critical areas including the server and network rooms which operate continuously. • Hot water is predominantly generated by local electric water heaters. Existing Energy Infrastructure • In 2024 the Council installed a 150 kW solar PV array alongside approximately 180 kWh of battery storage. • Annual electricity generation from the array is approximately 145,000 kWh. • Grid electricity consumption is approximately 205,000 kWh per year in addition • Gas consumption is approximately 425,000 kWh per year. • Heating demand is strongly occupancy driven, with peaks of approximately 28–34 kW during morning warm up periods and typical daytime loads between 16–24 kW. Project Aim • The Council is seeking to significantly reduce its reliance on gas and improve the environmental performance of the building. • This engagement will help explore viable options for the deployment of heat pump technology and associated system upgrades. • The Council is open to a range of approaches and is seeking a design led solution tailored to the building and its operation as well as the existing plant infrastructure in place. The Council is interested in proposals and input relating to: • Air source and ground source heat pump systems • Hybrid systems integrating with existing gas boilers • Low temperature heating strategies and retrofit solutions • Modest fabric improvements where appropriate • Integration with existing solar PV and battery storage • Control strategies to optimise system performance The Council is particularly interested in solutions which minimise disruption and make effective use of existing infrastructure where appropriate. The Council invites interested parties to provide information including: • Outline of proposed technical approaches • Indicative capital costs • Expected operational savings • Carbon reduction estimates and payback periods • Programme and delivery considerations • Key risks, constraints and assumptions The Council is particularly interested in understanding both financial and carbon payback metrics.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Preliminary market engagement notice · UK2, notice 054427-2026

About the buyer

Similar open tenders

All open construction tenders
  1. Local Electric Vehicle Infrastructure (LEVI) Concession

    Cornwall CouncilSouth WestOffice supplies and equipment, Construction

    Closing soon9 hours leftSuitable for SMEs

    £92.8mestimated
  2. Consumer Electrical Isolation Switches

    Bristol City CouncilSouth WestConstruction, Electrical

    Closing soon9 hours leftSuitable for SMEs

    £4.4mestimated
  3. Wootton Parish Council - Provision and Installation of Two New Play Areas

    Wootton Parish CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestGrounds maintenance and landscaping, Construction

    Closing soon2 days left2 lotsSuitable for SMEsSmall contract

    £160kestimated
  4. NDC0086-26 - Fairview Car Park

    North Devon District CouncilSouth WestConstruction

    Closing soon2 days leftSuitable for SMEsSmall contract

    £180kestimated
  5. Major Voids Refurbishments - 9 Bunting Way, Forest Green, Nailsworth, GL6 0TQ

    Stroud District CouncilSouth WestConstruction

    Closing soon2 days leftSuitable for SMEsSmall contract

    £90kestimated

From notice 054427-2026 on Find a Tender, first published 9 June 2026. We last checked for changes on 28 September 2026.