the provision of Installation, Operation and Maintenance of Electric Vehicle ChargePoint's through the Local Electric Vehicle Infrastructure Fund PROC128
Peterborough City Council · Local authority
In brief
Peterborough City Council was looking for suppliers for energy and construction work. Bidding has closed and no award has been published yet.
The estimated value is £198,000,000 excluding VAT.
The contract runs for 15 years, up to 16 years with extensions, starting 17 September 2026.
It is split into 2 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Lots
| Lot | Trade | Value |
|---|---|---|
| Peterborough City Council authority area 17 September 2026 to 17 September 2041 What this lot coversIt is anticipated that the contract will focus on providing EVI in residential areas that have limited access to off-street parking. This may be a combination of delivery of infrastructure within communal residential car parks as well as on-street charging spaces. It is anticipated that most of the charging infrastructure will be standard (-7-22kW). Rapid charging and public car parks operated by the local authorities will not be included within the specification, however, there may be separate opportunities with each council in due course. In the Peterborough area | Construction, IT services and software, Energy and utilities | £39,600,000 |
| Cambridgeshire County Council authority area 17 September 2026 to 17 September 2041 What this lot coversIt is anticipated that the contract will focus on providing EVI in residential areas that have limited access to off-street parking. This may be a combination of delivery of infrastructure within communal residential car parks as well as on-street charging spaces. It is anticipated that most of the charging infrastructure will be standard (-7-22kW). Rapid charging and public car parks operated by the local authorities will not be included within the specification, however, there may be separate opportunities with each council in due course. In the Cambridgeshire (less Peterborough) area | Energy and utilities | £158,400,000 |
Timeline
- Pipeline notice · UK1, notice 014111-2026
- Tender notice · UK4, notice 032568-2026
About the buyer
Procurements
86Awards
33Suppliers it has used most for energy
- Next Gen Eco Solutions Limited1 contract
- Professional Energy Solutions Limited1 contract
- Sureserve Energy Services South West Ltd1 contract
Similar open tenders
All open energy tenders- £1.7mestimated
- £8bnframework ceiling
- £260mframework ceiling
- £10mframework ceiling
- £40mestimated
From notice 014111-2026 on Find a Tender, first published 17 February 2026, last updated 9 April 2026. We last checked for changes on 28 September 2026.