Thermal Buffer Technology
UK Industrial Fusion Solutions Ltd · Public undertaking
In brief
UK Industrial Fusion Solutions Ltd has announced plans to buy architecture and engineering and construction work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The notice does not state a value.
The contract runs for 4 years, starting 1 April 2029.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Typical: a median of 4 bids per contract for this buyer (from 20 awards in the last 12 months).
What the notice says
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the design and development of a thermal storage system that integrates with the STEP power cycle. While the power cycle is designed to efficiently integrate heat from the tokamak device during a high power steady state scenario, the power cycle and cooling systems must also be highly flexible to adapt to uncertain prototypic operations e.g. the systems must have the ability to switch on and off and ramp up…Read the full description
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification.
UKIFS is seeking experts to support the design and development of a thermal storage system that integrates with the STEP power cycle. While the power cycle is designed to efficiently integrate heat from the tokamak device during a high power steady state scenario, the power cycle and cooling systems must also be highly flexible to adapt to uncertain prototypic operations e.g. the systems must have the ability to switch on and off and ramp up and down at the start and end of operational periods. Significant thermal power will be generated from the tokamak device during the ‘rapid density rise phase’ of the reactor plasma ramp up, lasting a few minutes. This is an effective ramp of 2GWth generated from the tokamak during these few minutes.
To manage this very immediate and sudden generation of heat from the tokamak, a minimum amount of thermal storage will be needed to increase the thermal inertia of the primary coolant loops, allowing the power cycle to ramp up to 100% load in a timely manner. Further, thermal storage may be needed to enable partial operation of the power cycle during the transition between the initial pre-heat to part load operational period.
The thermal storage system will be expected to extract heat from a hot CO2 primary coolant during the ramp up phase and deliver heat back to the CO2 primary coolant (or to a separate secondary working fluid) during the ramp down phase. The proposed technical operating conditions of the thermal storage system and load requirements are:
-CO2 primary coolant operating pressure: 50 to 150 bar.
-CO2 primary coolant operating temperature: 550°C to 650°C.
-Thermal duty in the region of 800MW.
-Required energy storage of 150MWh.
-Required fast ramping duration in a few minutes.
Systems of interest & key words:
-Thermal energy storage
-Latent heat storage
-Sensible heat storage
-Thermochemical heat storage
-Thermal battery
-Molten salt storage systems
-Molten salt heat exchangers/ steam generators
-Phase change materials
-Metallic phase change materials
-Solid state energy storage
-Packed bed storage
-Concrete battery
-Sand battery
Please note that the CPV codes given in this notice have now been corrected.
To view this notice, please click here:
https://ukifs.delta-esourcing.com/delta/viewNotice.html?noticeId=1009995808
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 007051-2026
- Preliminary market engagement notice · UK2, notice 007421-2026
About the buyer
UK Industrial Fusion Solutions LtdLast 12 months
Procurements
107Awards
44Suppliers it has used most for architecture and engineering
- Altrad Babcock Limited3 contracts
- Kyoto Fusioneering Limited3 contracts
- Amentum Clean Energy Limited2 contracts
- NPL Management Limited2 contracts
- Oxford Sigma Limited2 contracts
Similar open tenders
All open architecture and engineering tenders- £10.7mestimated
- Value not stated
- £149kestimated
- £4.5mframework ceiling
- £375kestimated
From notice 007051-2026 on Find a Tender, first published 27 January 2026, last updated 28 January 2026. We last checked for changes on 28 September 2026.