AwardedAwarded 8 January 2026
Transaction Management System
Rail Settlement Plan Limited · Local or regional public body
In brief
Rail Settlement Plan Limited awarded IT and software work to Colibri Digital on 8 January 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
RDG operates the Digital Ticketing Service (DTS), formerly known as Central Back Office (CBO) on behalf of the UK rail industry to support the provision of ITSO smartcard ticket services. Established in 2014, one of the key components of the CBO is the Transaction Management System (TMS) which is in its extension period and due for renewal. TMS is a bespoke system that was designed and developed specifically to meet the needs of National Rail. This included specific requirements for the combined management, reporting and control of multiple TOC ITSO (electronic smartcards) schemes, scheme interoperability and integration and reporting to a number of external systems. The TMS has…Read the full description
RDG operates the Digital Ticketing Service (DTS), formerly known as Central Back Office (CBO) on behalf of the UK rail industry to support the provision of ITSO smartcard ticket services. Established in 2014, one of the key components of the CBO is the Transaction Management System (TMS) which is in its extension period and due for renewal.
TMS is a bespoke system that was designed and developed specifically to meet the needs of National Rail. This included specific requirements for the combined management, reporting and control of multiple TOC ITSO (electronic smartcards) schemes, scheme interoperability and integration and reporting to a number of external systems. The TMS has subsequently been incrementally developed, maintained and operated by the same supplier, Colibri, to meet the changing requirements of the rail industry. RDG, via RSP, own the TMS Intellectual Property (IP) and code / system.
This modification is a permitted modification under Section 74 and Paragraph 8 of Schedule 8 (Additional Goods, Services or Works) of the Procurement Act 2023. The contract provides bespoke software services critical to national rail operations. A change of supplier at this juncture cannot be made at this point in time for technical reasons because: (i) a new supplier would face significant interchangeability issues with the existing proprietary architecture; and (ii) it would result in a substantial duplication of costs for RDG.
These technical constraints are compounded by the transition to Great British Railways (GBR). Procuring a replacement system now would cause significant inconvenience and disproportionate financial risk before the long-term strategic and technical requirements of GBR are established. The extension is strictly limited to a duration that ensures operational continuity until the GBR transition allows for a settled procurement strategy.
Who won
| Winner | Value | Dates |
|---|---|---|
| Colibri Digital | £1,429,917 | Awarded 8 January 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 005571-2026
- Contract award notice · UK6, notice 005577-2026
About the buyer
Rail Settlement Plan LimitedLast 12 months
Procurements
43Awards
31Suppliers it has used most for IT and software
- Colibri Digital2 contracts
- TRACSIS Rail Technology & Services2 contracts
- Contentful (UK) Limited1 contract
- Cubic Transportation Systems Limited1 contract
- Eckoh UK Limited1 contract
Similar open tenders
All open IT and software tenders- £55kestimated
- £350mframework ceiling
- £200kestimated
- £1.6mestimated
- £30kestimated
From notice 005571-2026 on Find a Tender, first published 22 January 2026, last updated 22 January 2026. We last checked for changes on 28 September 2026.