Dog Wood Cycle Path Design
Knutsford Town Council · Local authority
In brief
Knutsford Town Council was looking for suppliers for construction and highways work. Bidding has closed and no award has been published yet.
The estimated value is £37,500 excluding VAT.
The contract runs for 5 months, starting 8 June 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The Knutsford Neighbourhood Plan and Cycle Infrastructure Plan identified the desirability of creating a cycle path linking Church Walk with Parkgate Lane via Dog Wood. The route would pass through multiple landownerships including a section of Tatton Park and would connect the town centre with the new housing development and the industrial park as well as providing a safe cycling/walking route from the eastern edge of town to the town centre. In 2024, using a grant through the Shared Prosperity Fund, the council commissioned a preliminary design for the route to enable the project to be progressed. The report recommended further pre-tendering works to undertake more detailed land…Read the full description
The Knutsford Neighbourhood Plan and Cycle Infrastructure Plan identified the desirability of creating a cycle path linking Church Walk with Parkgate Lane via Dog Wood. The route would pass through multiple landownerships including a section of Tatton Park and would connect the town centre with the new housing development and the industrial park as well as providing a safe cycling/walking route from the eastern edge of town to the town centre.
In 2024, using a grant through the Shared Prosperity Fund, the council commissioned a preliminary design for the route to enable the project to be progressed. The report recommended further pre-tendering works to undertake more detailed land investigations including a topographical survey and ground investigations. We now wish to undertake this work. The initial report outlined two options (A and B). It is intended that only one option would be developed under this commission; which option would be selected as part of the process.
The most challenging stakeholder to secure permission from is likely to be the National Trust and they will require a more detailed report on the impact to the historic landscape alongside tree surveys and an ecology report for their portion of the route (Tatton Park, the red area between the two blue sections on page 11). It has also been discussed that an ecological appraisal would be beneficial for the whole route.
TENDER REQUIREMENTS
Please provide a tender to:
a) undertake a topographical / land survey (incl. tree survey, services, levels, fence lines, etc) to inform the development of the preferred route for the path
b) undertake necessary ground investigations / testing
c) prepare a detailed / construction design / tender documentation for a single route option
d) provide a historic landscape impact assessment (limited to the section which would pass through the National Trust's landholding)
e) provide an ecological appraisal for the creation of the path
Timeline
- Tender notice · UK4, notice 035362-2026
About the buyer
Knutsford Town CouncilLast 12 months
Procurements
3Awards
0Similar open tenders
All open construction tenders- £50mframework ceiling
- £8mframework ceiling
- £160kestimated
- £24kestimated
- £590kestimated
From notice 035362-2026 on Find a Tender, first published 17 April 2026. We last checked for changes on 28 September 2026.