In brief
Scottish Power UK plc was looking for suppliers for architecture and engineering work. Bidding has closed and no award has been published yet.
The estimated value is £6,000,000 including VAT.
The contract runs for 52 months, starting 2 November 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The Employer is looking to appoint a Study Contractor for its Eastern Green Link 4 (EGL4) Project. The scope is split into two stages, in a First Stage the Study Contractor will develop the AC network models, and in a Second Stage, will work with an High Voltage Direct Current (HVDC) Contractor to test the EGL4 HVDC Link control system.
Within the AQ Document attached a more detailed description of the scope is provided.
Timeline
- Tender notice · UK4, notice 039911-2026
About the buyer
Scottish Power UK plcLast 12 months
Procurements
7Awards
2Similar open tenders
All open architecture and engineering tenders- £149kestimated
- £4.5mframework ceiling
- £375kestimated
- £540kestimated
- £50mframework ceiling
From notice 039911-2026 on Find a Tender, first published 30 April 2026. We last checked for changes on 28 September 2026.