AwardedAwarded 10 July 2026
Langton Mine Water Treatment Scheme (MWTS) Design and Build
Mining Remediation Authority · Public body
In brief
Mining Remediation Authority awarded construction and building maintenance work to JN Bentley Ltd on 10 July 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
pumped passive Mine Water Treatment Scheme (MWTS) at the site in Langton to protect and enhance the environment through the control and management of coal mine water and to mitigate the deterioration of water quality and ground water resources.
We have completed a compliant Early Contractor Involvement (2 Stage) procurement by conducting mini competition through the Pagabo Civils and Infrastructure Framework Lot 2 Midlands - Water Supply & Waste Water in accordance with Public Contract Regulations 2015 (PCR15).
2-stage procurement approach via the X22 - Early Contractor Involvement (ECI) mechanism through a NEC4 Engineering and Construction Contract. Stage 1 is the pre-construction ECI phase, with development of the scope, detailed design and agreement on price for construction.
Who won
| Winner | Value | Dates |
|---|---|---|
| JN Bentley Ltd 3 bids received | £186,002 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract award notice · notice 072761-2026
About the buyer
Mining Remediation AuthorityLast 12 months
Procurements
73Awards
57Suppliers it has used most for construction
- Jim Davies Civil Engineering Ltd4 contracts
- Llettyshenkin Construction Company Limited4 contracts
- Nal Plant Limited4 contracts
- Bethell Construction Limited3 contracts
- Thomas Menzies (Builders) Limited3 contracts
Similar open tenders
All open construction tenders- £1mframework ceiling
- £2.61mestimated
- £36.6mestimated
- £160kestimated
- £60kestimated
From notice 072761-2026 on Find a Tender, first published 31 July 2026. We last checked for changes on 28 September 2026.