AwardedAwarded 25 June 2026
Procurement of Testing Campaign Using a Packed Bed Flow Reactor – PP-UKIFS - 458
UK Industrial Fusion Solutions Ltd · Public undertaking
In brief
UK Industrial Fusion Solutions Ltd awarded architecture and engineering and laboratory equipment work to Kyoto Fusioneering Limited on 25 June 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Procurement of suitable Suppliers that can provide access to a small-scale flow reactor instrument or test rig to perform characterisation experiments on solid materials. The test requirement is to perform absorption breakthrough analysis to verify the effectiveness of getter materials at removal of contaminants from a flowing noble gas stream. The contaminants involved are hydrogen, carbon monoxide, carbon dioxide, oxygen & nitrogen. The supplier will be responsible for providing access to or procuring the necessary instrumentation to host these tests and performing a programme of tests for four sample materials with two gas mixtures.
Who won
| Winner | Value | Dates |
|---|---|---|
| Kyoto Fusioneering Limited | £99,098 | 26 June 2026 to 31 March 2027 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract details notice · UK7, notice 077010-2026
Last time this was bought
Procurement of Testing Campaign Using a Packed Bed Flow Reactor – PP-UKIFS- 458
- Awarded
- 29 May 2026
- Value
- £80,000
- Bids
- 2
Matched on UK Industrial Fusion Solutions Ltd, the type of work and the title. Check the notice to be sure.
About the buyer
UK Industrial Fusion Solutions LtdLast 12 months
Procurements
107Awards
44Suppliers it has used most for architecture and engineering
- Altrad Babcock Limited3 contracts
- Kyoto Fusioneering Limited3 contracts
- Amentum Clean Energy Limited2 contracts
- NPL Management Limited2 contracts
- Oxford Sigma Limited2 contracts
Similar open tenders
All open architecture and engineering tenders- £149kestimated
- £4.5mframework ceiling
- £375kestimated
- £540kestimated
- £50mframework ceiling
From notice 077010-2026 on Find a Tender, first published 13 August 2026. We last checked for changes on 28 September 2026.