Upcoming
Test Operations Partner – West Burton Region
UK Industrial Fusion Solutions Ltd · Public undertaking
In brief
UK Industrial Fusion Solutions Ltd has announced plans to buy architecture and engineering and research work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The notice does not state a value.
The contract runs for 4 weeks, starting 23 May 2026.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Typical: a median of 4 bids per contract for this buyer (from 23 awards in the last 12 months).
What the notice says
A single operational facility will be stood up to facilitate high priority test activities. This facility is likely to be an existing commercial lease unit. Enabling initial operations to occur, with a later migration to bespoke buildings in 2-4 years’ time, these will be located on or close to the West Burton Power plant site – a repurposed Coal Fired Power station site, that will accommodate the novel Prototype Fusion Power Plant being delivered by STEP. The tests that will be accommodated in this facility will involve many FOAK physical test rigs comprising of; Scaled Superconducting Magnets Testing, High Power Microwave Testing, Novel Cooling Cycle testing through high temperature…Read the full description
A single operational facility will be stood up to facilitate high priority test activities. This facility is likely to be an existing commercial lease unit. Enabling initial operations to occur, with a later migration to bespoke buildings in 2-4 years’ time, these will be located on or close to the West Burton Power plant site – a repurposed Coal Fired Power station site, that will accommodate the novel Prototype Fusion Power Plant being delivered by STEP.
The tests that will be accommodated in this facility will involve many FOAK physical test rigs comprising of; Scaled Superconducting Magnets Testing, High Power Microwave Testing, Novel Cooling Cycle testing through high temperature turbo machinery, Control Room simulator and other smaller activities. Each will have its own complexities and operational risks/hazards that must be managed appropriately (including but not limited to: Hazardous Voltages, Pressurised Systems, Flammable substances, Cryogenics, High Magnetic fields/ Radiofrequency energy, (note that no radioactive testing is planned in this facility at this initial site). Co-ordinating of these activities is crucial for programme success, using digital tools / BIMS for space allocation etc. Please find more information within the attachment.
For more information about this opportunity, please visit the eSourcing portal at:
https://ukfe.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-services./C5FWZYGQXZ
To respond to this opportunity, please click here:
https://ukfe.delta-esourcing.com/respond/C5FWZYGQXZ
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 048275-2026
About the buyer
UK Industrial Fusion Solutions LtdLast 12 months
Procurements
107Awards
44Suppliers it has used most for architecture and engineering
- Altrad Babcock Limited3 contracts
- Kyoto Fusioneering Limited3 contracts
- Amentum Clean Energy Limited2 contracts
- NPL Management Limited2 contracts
- Oxford Sigma Limited2 contracts
Similar open tenders
All open architecture and engineering tenders- £149kestimated
- £4.5mframework ceiling
- £375kestimated
- £540kestimated
- £50mframework ceiling
From notice 048275-2026 on Find a Tender, first published 22 May 2026. We last checked for changes on 28 September 2026.